ceramic disc capacitors Cornell Dubilier Electronics GP322 with long lead wires and conformal coating
Price:
Negotiable
MOQ:
Negotiable
Delivery Time:
Negotiable
Product Description
Product Overview
Type G general purpose disc ceramic capacitors are designed for low-cost, small-size applications requiring low to high DC voltage. They are suitable for general purpose, coupling, by-pass, and filtering applications. Key advantages include a small size, conformal coating, radial leads, and long leads.
Product Attributes
- Brand: CDE Cornell Dubilier
- Certifications: Complies with the EU Directive 2002/95/EC (RoHS Compliant)
- Material: Ceramic Disc
- Coating: Conformal Coating
- Lead Material: Tinned copper wire (Minimum lead content: 5%)
Technical Specifications
| Type | Capacitance Range | Voltage Range | Tolerance | Operating Temperature Range | Insulation Resistance | Dissipation Factor | Breakdown Voltage | Lead Length | Size (Inches) D | Size (Inches) T | Size (Inches) S | Size (mm) d |
| GE | 5 pF to 22,000 pF | 50, 100, 500 Vdc | 5%, 10%, 20% | -30 C to +85 C | 10,000 M minimum | 2.5% max. @ 1 kHz; Y5U: 4% @ 1kHz | 2.5 x rated voltage for 5 seconds maximum | 1.0 inch minimum | 0.118 to 0.472 | 0.118 to 0.157 | 0.098 to 0.374 | 2.5 to 9.5 |
| GH | 2,200 pF | 100 Vdc | 20% | -30 C to +85 C | 10,000 M minimum | 4% @ 1kHz (Y5U) | 2.5 x rated voltage for 5 seconds maximum | 1.0 inch minimum | 0.236 | 0.118 | 0.252 | 6.0 |
| GM | 1,000 pF to 22,000 pF | 500 Vdc | 10%, 20%, -20+80% | -30 C to +85 C | 10,000 M minimum | 2.5% max. @ 1 kHz; Y5U: 4% @ 1kHz | 2.5 x rated voltage for 5 seconds maximum | 1.0 inch minimum | 0.157 to 0.642 | 0.157 | 0.250 to 0.374 | 4.0 to 9.5 |
| GP | 470 pF to 22,000 pF | 1000 Vdc | 10%, 20% | -30 C to +85 C | 10,000 M minimum | 2.5% max. @ 1 kHz; Y5U: 4% @ 1kHz | 2.5 x rated voltage for 5 seconds maximum | 1.0 inch minimum | 0.177 to 0.748 | 0.177 | 0.252 to 0.374 | 4.5 to 9.5 |
Get in Touch
Have questions about our products or want to discuss a custom order? Our team is ready to help you.
Company
Beijing Silk Road Enterprise Management Services Co., Ltd.
Location
16 Floor, Unit B, Jiatai International Mansion, No 41, Dongsihuan Zhong Road, Chaoyang District, Beijing
Contact Person
Sellina