high voltage ceramic capacitor HVC HVC-15KV-DL14-F12.5-471K with straight long lead style and bulk packing
Price:
Negotiable
MOQ:
Negotiable
Delivery Time:
Negotiable
Product Description
High Voltage Ceramic Capacitor
This specification applies to high voltage ceramic capacitors used in high voltage electric equipment. These capacitors are designed for applications requiring high reliability and are suitable for use in various high-voltage electric equipment. They are manufactured by HVC Capacitor Manufacturing Co.,Ltd., a Hong Kong-funded enterprise established in January 2012, leveraging over 20 years of experience from a Taiwanese manufacturer of high-voltage ceramic products.
Product Attributes
- Brand: HVC
- Origin: China
- Material: N4700 -grade ceramic dielectric material
- Color: Blue ceramic disc type, Black epoxy resin encapsulation for bolt type
- Certifications: Not explicitly mentioned in the provided text.
Technical Specifications
| Part Number | Temperature Characteristic | Capacitance (pF) | Capacitance Tolerance (%) | DC Rated Voltage (kV) | Dimensions (mm) D | Dimensions (mm) T | Dimensions (mm) F | Dimensions (mm) L | Lead Style | Packing Type | Pack Qty. |
| HVC-15KV-DL14-F12.5-471K | N4700 | 470 | ±10 | 15 | 14 | 12.5 | 500 | 0.8 | Straight long | Bulk |
Get in Touch
Have questions about our products or want to discuss a custom order? Our team is ready to help you.
Company
Beijing Silk Road Enterprise Management Services Co., Ltd.
Location
16 Floor, Unit B, Jiatai International Mansion, No 41, Dongsihuan Zhong Road, Chaoyang District, Beijing
Contact Person
Sellina