Beijing Silk Road Enterprise Management Services Co., Ltd.
                                                                                                           
Verified Supplier
17 Years
Since 2009
Menu

high voltage ceramic capacitor HVC HVC-10KV-DL16-F12.5-102K 1000pF 10KV with straight long lead style

Price Negotiable
Price: Negotiable
MOQ: Negotiable
Delivery Time: Negotiable
Product Description

Product Overview

High Voltage Ceramic Capacitor designed for high voltage electric equipment. This capacitor features a ceramic disc construction with solder-coated copper wire terminations. It is suitable for applications requiring high reliability and is manufactured by HVC Capacitor Manufacturing Co.,Ltd.

Product Attributes

  • Brand: HVC
  • Origin: China (Manufacturing base in Dongguan Humen)
  • Material: Ceramic (N4700 -grade dielectric material for certain models)
  • Color: Blue (for ceramic disc type), Black (for bolt type)
  • Certifications: Not explicitly mentioned, but N4700 is described as -grade.

Technical Specifications

Part NumberCapacitance (pF)Capacitance Tolerance (%)DC Rated Voltage (kV)Temperature CharacteristicDimensions (mm) (D x T x F)Lead Spacing (mm)Lead StylePacking Type
HVC-10KV-DL16-F12.5-102K1000±1010N470016 x 4.0 max x 12.512.5Straight longBulk
HVC N4700 10KV 102K1000±1010N470016 x 4.0 max x 12.512.5Straight longBulk

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company Beijing Silk Road Enterprise Management Services Co., Ltd.
Location 16 Floor, Unit B, Jiatai International Mansion, No 41, Dongsihuan Zhong Road, Chaoyang District, Beijing
Contact Person Sellina

Request A Quote

Please check your email address.
Your message must be at least 20 characters.