Electrolytic Capacitor 330uF 25V Nantong Jianghai Capacitor ECR1ELY331MLL080011E Long Lead PET Sleeve
Price:
Negotiable
MOQ:
Negotiable
Delivery Time:
Negotiable
Product Description
Product Overview
The CD284L series Aluminum Electrolytic Capacitor from Nantong Jianghai Capacitor Co., Ltd. is designed for various electronic applications. This specification sheet details its performance characteristics, dimensions, and material composition, ensuring reliable operation within specified temperature and voltage ranges.
Product Attributes
- Brand: Nantong Jianghai Capacitor Co., Ltd.
- Origin: China
- Product Type: Aluminum Electrolytic Capacitor
- Series: CD284L
- Sleeve Material: PET
- Marking: Laser printing, Ink printing, or Carbon ribbon printing (customer specific options available)
- RoHS Statement: Compliant with RoHS directive standards.
Technical Specifications
| Part No. | Rated Voltage (UR(V)) | Nominal Capacitance (CAP(uF)) | Capacitance Tolerance (%) | Dissipation Factor tg (%) (20, 120Hz) | Leakage Current (LC(uA)) (20, 2 min) | Standard Size D*L(mm) | Ripple Current (mArms) (105, 100k Hz) | Lifetime (Hours) (105) | Lead Form | Sleeve |
| ECR1ELY331MLL080011E | 25 | 330 | 20 | 14 | 82.5 | 8 * 11.5 | 945 | 8000 | Long Lead | PET Black |
Get in Touch
Have questions about our products or want to discuss a custom order? Our team is ready to help you.
Company
Beijing Silk Road Enterprise Management Services Co., Ltd.
Location
16 Floor, Unit B, Jiatai International Mansion, No 41, Dongsihuan Zhong Road, Chaoyang District, Beijing
Contact Person
Sellina