Electrolytic Capacitor Long Lead 1uF 50V Xunda NP1051HMC112RB Stable Performance Bipolar Type
Price:
Negotiable
MOQ:
Negotiable
Delivery Time:
Negotiable
Product Description
Product Overview
The XUNDA NP series aluminum electrolytic capacitors are low-loss, bipolar capacitors with stable and reliable performance. They are designed for audio electronic circuits and DC or pulsating circuits with polarity reversal. These capacitors are characterized by their single-ended lead wire type and are suitable for direct insertion into mounting.
Product Attributes
- Brand: XUNDA
- Origin: Dongguan, China
- Certifications: GB2693-88 (Reference Standard)
Technical Specifications
| Series | Customer Part No. | XUNDA Part No. | Specification | Processing Form | Capacitance/Voltage | Dimensions (mm) | Tolerance (%) | Leakage Current (uA) | Max Ripple Current (120Hz/105) (mA) | Surge Voltage (SV) |
| NP | NP1051HMC112RB | Long Lead | 1uF/50v | 5*11 | ||||||
| NP | 1uF/50V | Long Lead | 1uF/50V | 5*11 | 10% | 3.0 | 13 | 63 | ||
| NP | 4.7uF/50V | Long Lead | 4.7uF/50V | 6.3*11 | 10% | 3.0 | 13 | 63 | ||
| NP | 10uF/50V | Long Lead | 10uF/50V | 8*12 | 10% | 3.0 | 13 | 63 | ||
| NP | 47uF/50V | Long Lead | 47uF/50V | 10*13 | 10% | 3.0 | 13 | 63 | ||
| NP | 100uF/50V | Long Lead | 100uF/50V | 10*17 | 10% | 3.0 | 13 | 63 | ||
| NP | 220uF/50V | Long Lead | 220uF/50V | 13*20 | 10% | 3.0 | 13 | 63 | ||
| NP | 470uF/50V | Long Lead | 470uF/50V | 16*25 | 10% | 3.0 | 13 | 63 | ||
| NP | 1000uF/50V | Long Lead | 1000uF/50V | 18*25 | 10% | 3.0 | 13 | 63 | ||
| NP | 1uF/63V | Long Lead | 1uF/63V | 5*11 | 10% | 3.0 | 13 | 79 | ||
| NP | 4.7uF/63V | Long Lead | 4.7uF/63V | 6.3*11 | 10% | 3.0 | 13 | 79 | ||
| NP | 10uF/63V | Long Lead | 10uF/63V | 8*12 | 10% | 3.0 | 13 | 79 | ||
| NP | 47uF/63V | Long Lead | 47uF/63V | 10*13 | 10% | 3.0 | 13 | 79 | ||
| NP | 100uF/63V | Long Lead | 100uF/63V | 13*20 | 10% | 3.0 | 13 | 79 | ||
| NP | 220uF/63V | Long Lead | 220uF/63V | 16*25 | 10% | 3.0 | 13 | 79 | ||
| NP | 470uF/63V | Long Lead | 470uF/63V | 18*25 | 10% | 3.0 | 13 | 79 | ||
| NP | 1000uF/63V | Long Lead | 1000uF/63V | 22*25 | 10% | 3.0 | 13 | 79 | ||
| NP | 1uF/100V | Long Lead | 1uF/100V | 6.3*11 | 10% | 3.0 | 13 | 125 | ||
| NP | 4.7uF/100V | Long Lead | 4.7uF/100V | 8*12 | 10% | 3.0 | 13 | 125 | ||
| NP | 10uF/100V | Long Lead | 10uF/100V | 10*13 | 10% | 3.0 | 13 | 125 | ||
| NP | 47uF/100V | Long Lead | 47uF/100V | 13*20 | 10% | 3.0 | 13 | 125 | ||
| NP | 100uF/100V | Long Lead | 100uF/100V | 16*25 | 10% | 3.0 | 13 | 125 | ||
| NP | 220uF/100V | Long Lead | 220uF/100V | 18*25 | 10% | 3.0 | 13 | 125 | ||
| NP | 470uF/100V | Long Lead | 470uF/100V | 22*25 | 10% | 3.0 | 13 | 125 | ||
| NP | 1000uF/100V | Long Lead | 1000uF/100V | 25*30 | 10% | 3.0 | 13 | 125 | ||
| NP | 1uF/160V | Long Lead | 1uF/160V | 8*12 | 10% | 3.0 | 13 | 200 | ||
| NP | 4.7uF/160V | Long Lead | 4.7uF/160V | 10*13 | 10% | 3.0 | 13 | 200 | ||
| NP | 10uF/160V | Long Lead | 10uF/160V | 13*20 | 10% | 3.0 | 13 | 200 | ||
| NP | 47uF/160V | Long Lead | 47uF/160V | 16*25 | 10% | 3.0 | 13 | 200 | ||
| NP | 100uF/160V | Long Lead | 100uF/160V | 18*25 | 10% | 3.0 | 13 | 200 | ||
| NP | 220uF/160V | Long Lead | 220uF/160V | 25*30 | 10% | 3.0 | 13 | 200 | ||
| NP | 1uF/200V | Long Lead | 1uF/200V | 10*13 | 10% | 3.0 | 13 | 250 | ||
| NP | 4.7uF/200V | Long Lead | 4.7uF/200V | 13*20 | 10% | 3.0 | 13 | 250 | ||
| NP | 10uF/200V | Long Lead | 10uF/200V | 16*25 | 10% | 3.0 | 13 | 250 | ||
| NP | 47uF/200V | Long Lead | 47uF/200V | 18*25 | 10% | 3.0 | 13 | 250 | ||
| NP | 100uF/200V | Long Lead | 100uF/200V | 25*30 | 10% | 3.0 | 13 | 250 | ||
| NP | 1uF/250V | Long Lead | 1uF/250V | 13*20 | 10% | 3.0 | 13 | 300 | ||
| NP | 4.7uF/250V | Long Lead | 4.7uF/250V | 16*25 | 10% | 3.0 | 13 | 300 | ||
| NP | 10uF/250V | Long Lead | 10uF/250V | 18*25 | 10% | 3.0 | 13 | 300 | ||
| NP | 47uF/250V | Long Lead | 47uF/250V | 25*30 | 10% | 3.0 | 13 | 300 |
Get in Touch
Have questions about our products or want to discuss a custom order? Our team is ready to help you.
Company
Beijing Silk Road Enterprise Management Services Co., Ltd.
Location
16 Floor, Unit B, Jiatai International Mansion, No 41, Dongsihuan Zhong Road, Chaoyang District, Beijing
Contact Person
Sellina