Beijing Silk Road Enterprise Management Services Co., Ltd.
                                                                                                           
Verified Supplier
17 Years
Since 2009
Menu

Unipolar Aluminum Electrolytic Capacitor Xunda NP3351HMC112RB 3.3uF 50V Long Lead Low Loss Stable Performance

Price Negotiable
Price: Negotiable
MOQ: Negotiable
Delivery Time: Negotiable
Product Description

Product Overview

The XUNDA NP series are unipolar aluminum electrolytic capacitors, designed as single-ended lead types. These capacitors offer low loss and stable performance, making them suitable for audio electronic circuits and DC or pulsating circuits where polarity reversal occurs.

Product Attributes

  • Brand: XUNDA
  • Origin: Dongguan Xunda Electronics Co., Ltd.
  • Material: Aluminum electrolytic capacitors
  • Certifications: GB2693-88 (Reference Standard)

Technical Specifications

SeriesCustomer Part No.Xunda Part No.SpecificationCapacity/VoltageDimensions (mm)Processing FormLoss (%)Leakage Current (uA)Max Ripple Current (120Hz/105) (mA)Surge Voltage (SV)Tolerance (%)Remarks
NPNP3351HMC112RB3.3uF/50v5*11Long lead144.952763±20Long lead
NP50VDC3.3uF5*11144.952763±20Long lead
NP6.3VDC0.268
NP10VDC0.2413
NP16VDC0.2220
NP25VDC0.2032
NP35VDC0.1644
NP50VDC0.1463
NP63VDC0.1279
NP100VDC0.10125
NP160~250VDC0.20200~300
ItemTest ConditionRequirement
Appearance InspectionVisualMarking clear, conforms to 2.3.7 requirements
External DimensionsMeasuring tool testConforms to 2.2 requirements
CapacitanceFrequency (120Hz or 1KHZ±10%), Temp 25±5Conforms to 2.3.2 requirements
Dissipation FactorFrequency (120Hz or 1KHZ±10%), Temp 25±5Conforms to 2.3.5 requirements
Leakage Current25±5, apply rated voltage for 2 minutesConforms to 2.3.6 requirements
SolderabilityTemp 265±5, immersion time 5±1S, immersion depth 5±1mm95% or more area tinned, leads bright and smooth
Heat Resistance to SolderingFrom lead root 1.5~2.0mm, immerse in molten solder at 350 for 3 seconds, then place at room temp for 2 hoursΔC/C≤±10%, TANδ≤200% of value specified in 2.3.5, I≤ requirements of 2.3.6 (rated voltage test), Appearance: no electrolyte leakage, no body deformation
Lead StrengthApply the following tensile force in the parallel direction of the lead, hold for 10S, no lead breakage or looseness0.5mm lead diameter: 0.51kg; 0.6mm~0.8mm lead diameter: 1.0kg; >0.8mm lead diameter: 2.0kg
High Temperature Characteristics+105, 10 minutes, apply rated voltage for 5 minutesI≤ 5 times the value specified in 2.3.6
High Temperature EnduranceApply rated voltage, duration 1000HRS, ambient temp +105, recovery time at room temp: 16HRSΔC/C≤±20%, TANδ≤200% of value specified in 2.3.5, I≤ requirements of 2.3.6 (rated voltage test), Appearance: no electrolyte leakage, no body deformation.
High Temperature StorageAmbient temp +105, duration: 1000HRS, recovery time at room temp: 16HRSΔC/C≤±20%, TANδ≤200% of value specified in 2.3.5, I≤ 2 times the value specified in 2.3.6 (rated voltage test), Appearance: no electrolyte leakage, no body deformation.
Surge Voltage TestCycle: 1000 times, Temp: +15~35, Charging voltage: see 2.3.8 SV value, Charging duration: 30S, Discharging duration: 330SΔC/C≤±20%, TANδ≤ value specified in 2.3.5, I≤ requirements of 2.3.6 (rated voltage test), Appearance: no electrolyte leakage, no body deformation.
Solvent ResistanceDichlorodifluoromethane, alcohol, trichlorodifluoroethane, time less than 5 minutes, recovery 15 minutesMarking clear, sleeve no poor shrinkage

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company Beijing Silk Road Enterprise Management Services Co., Ltd.
Location 16 Floor, Unit B, Jiatai International Mansion, No 41, Dongsihuan Zhong Road, Chaoyang District, Beijing
Contact Person Sellina

Request A Quote

Please check your email address.
Your message must be at least 20 characters.