Long Lead Type Aluminum Electrolytic Capacitor Xunda NP2751HMC112RB 2.7uF 50 Volt NP Series
Price:
Negotiable
MOQ:
Negotiable
Delivery Time:
Negotiable
Product Description
XUNDA NP Series Aluminum Electrolytic Capacitors
The XUNDA NP series are non-polar aluminum electrolytic capacitors designed with single-ended leads. They offer stable and reliable performance with low loss, making them suitable for audio electronic circuits and DC or pulsating circuits where polarity reversal may occur.
Product Attributes
- Brand: XUNDA
- Origin: Dongguan, China
- Product Series: NP
- Certifications/Standards: GB2693-88 (Reference)
Technical Specifications
| Customer P/N | XUNDA P/N | Capacitance | Voltage | Dimensions (mm) | Tolerance (%) | Leakage Current (uA) | Dissipation Factor (%) | Max Ripple Current (mA) | Surge Voltage (SV) | Lead Type |
|---|---|---|---|---|---|---|---|---|---|---|
| NP2751HMC112RB | 2.7uF/50v | 5*11 | ±10 | 4.05 | 14 | 26 | 63 | Long leads | ||
| 2.7 | 50 VDC | 5*11 | ±10 | 4.05 | 14 | 26 | 63 | Long leads |
| Parameter | Specification |
|---|---|
| Capacitance Range | 1~6800F |
| Rated Working Voltage (WVDC) | 6.3~250V |
| Operating Temperature Range | -40 ~ +105 |
| Capacitance Tolerance (120Hz, 255) | ±10% |
| Dissipation Factor (TAN) (120Hz, 255) | 0.10 to 0.26 (Varies with voltage) |
| Leakage Current (I) (at 255, 5 min @ WV) | I 0.03CV or 3A (whichever is greater) |
| Marking | Xunda, Series (NP), Rated Voltage, Nominal Capacitance, Sleeve Color (Black), Ink Color (White), Temperature (105), Tolerance (M) |
| Surge Voltage (SV) | 8 to 300V (Varies with WV) |
| Test Item | Test Condition | Requirement |
|---|---|---|
| Appearance Inspection | Visual | Clear marking, compliant with 2.3.7 |
| Dimensions | Measurement | Compliant with 2.2 |
| Capacitance | 120Hz (10%), 255 | Compliant with 2.3.2 |
| Dissipation Factor | 120Hz (10%), 255 | Compliant with 2.3.5 |
| Leakage Current | 255, 2 min @ WV | Compliant with 2.3.6 |
| Solderability | 2655, 51S dip, 51mm depth | 95% tinned area, bright and smooth leads |
| Solder Heat Resistance | 350 solder dip for 3s (1.5-2.0mm from lead root) | C/C10%, TAN200% of 2.3.5, I2.3.6, No electrolyte leakage or deformation |
| Lead Strength | Applied pull force for 10s | No lead breakage or looseness (Load varies by lead diameter) |
| High Temperature Characteristics | +105 for 10 min, 2 min @ WV | I5 times of 2.3.6 |
| High Temp. Endurance | 1000hrs @ +105, WV applied, 16hrs recovery | C/C20%, TAN200% of 2.3.5, I2.3.6, No leakage or deformation |
| High Temp. Storage | 1000hrs @ +105, 16hrs recovery | C/C20%, TAN200% of 2.3.5, I2 times of 2.3.6, No leakage or deformation |
| Surge Voltage Test | 1000 cycles, +15~35, 30s charge @ SV, 330s discharge | C/C20%, TAN2.3.5, I2.3.6, No leakage or deformation |
| Solvent Resistance | Dichlorodifluoromethane, Alcohol, Trichlorodifluoroethane (5 min exposure, 15 min recovery) | Clear marking, no sleeve shrinkage |
Get in Touch
Have questions about our products or want to discuss a custom order? Our team is ready to help you.
Company
Beijing Silk Road Enterprise Management Services Co., Ltd.
Location
16 Floor, Unit B, Jiatai International Mansion, No 41, Dongsihuan Zhong Road, Chaoyang District, Beijing
Contact Person
Sellina