Beijing Silk Road Enterprise Management Services Co., Ltd.
                                                                                                           
Verified Supplier
17 Years
Since 2009
Menu

Unipolar Aluminum Electrolytic Capacitor Xunda NP6851HMC112RB 6.8uF 50VDC Long Lead Type

Price Negotiable
Price: Negotiable
MOQ: Negotiable
Delivery Time: Negotiable
Product Description

Product Overview

The XUNDA NP series are unipolar aluminum electrolytic capacitors designed for audio electronic circuits and DC or pulsating circuits with polarity reversal. They offer stable and reliable performance with low loss and are available in a single-ended lead type.

Product Attributes

  • Brand: XUNDA
  • Origin: Dongguan, China
  • Material: Aluminum electrolytic
  • Sleeve Color: Black (standard), Purple, Blue, Green, Coffee available
  • Certifications: GB2693-88 (Reference Standard)

Technical Specifications

SeriesCustomer P/NXunda P/NCapacitance (uF)Voltage (VDC)Tolerance (%)Size (mm)Leakage Current (uA)Max Ripple Current (120Hz/105, mA)Surge Voltage (SV)Loss (%)Lead Type
NPNP6851HMC112RB6.850105*1110.2416314Long Lead
NP6.850105*1110.2416314Long Lead
SeriesRated Voltage (WV)Capacitance RangeCapacitance ToleranceWorking Temperature RangeLoss Tangent (TAN) @ 120Hz, 25Leakage Current (I)Surge Voltage (SV)
NP6.3~250V.DC1~6800F10%-40~+1050.26 (6.3V) to 0.10 (63V), 0.20 (100V, 160~250V)I0.03CV or 3A (Max)Refer to table
Rated Voltage (WV)Surge Voltage (SV)
6.38
1013
1620
2532
3544
5063
6379
100125
160200
200250
250300

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company Beijing Silk Road Enterprise Management Services Co., Ltd.
Location 16 Floor, Unit B, Jiatai International Mansion, No 41, Dongsihuan Zhong Road, Chaoyang District, Beijing
Contact Person Sellina

Request A Quote

Please check your email address.
Your message must be at least 20 characters.