Durable Overcurrent Protection Thermistor FH MZ21-P101RMGBF1E2S with Long Lead and Inside Kink Style
Price:
Negotiable
MOQ:
Negotiable
Delivery Time:
Negotiable
Product Description
Product Overview
The MZ21 Type PTC Thermistor is designed for overcurrent protection in telecommunication and AC circuits. Its compact structure makes it suitable for these applications.
Product Attributes
- Brand: MZ21
- Origin: Nanjing Nanshan Semiconductor Co., Ltd.
- Type: PTC Thermistor
Technical Specifications
| Part Number | Specification | Rated Resistance (251) | Switch Temperature (10) | Max. Voltage | Non-operating Current (25) | Typical Trip Current (25) | Operating Ambient Temperature Range | Chip Diameter | Lead Style | Lead Spacing | Wire Diameter | Lead Type |
| MZ21-P101RMGBF1E2S | PTC THERMISTOR | 100 20% | 120 | 270 Vac | 50 mA | 125 mA | -40~+85 | 7 mm | Inside Kink | 5.0 mm | 0.6 mm | Long Lead |
Get in Touch
Have questions about our products or want to discuss a custom order? Our team is ready to help you.
Company
Changsha Purple Horn E-Commerce Co., Ltd.
Location
2332 Kaibin Commercial Plaza, No. 419 Shaoshan Middle Road, Shazitang Street, Yuhua District, Changsha City, Hunan Province
Contact Person
Coral