Lightweight Modular Plastic Formwork Heavy Duty Reusable Plastic Formwork For Concrete Wall
Heavy Duty ABS Plastic Formwork Panels for Concrete Wall and Slab Construction
-
A high-performance construction solution made from durable ABS plastic, designed for efficient and reusable concrete forming. Ideal for demanding applications requiring superior strength and surface finish.
-
Exceptional Durability: Outstanding impact resistance and toughness, withstands heavy load and harsh job site conditions without cracking.
-
Superior Surface Quality: Produces an ultra-smooth concrete finish, minimizing post-processing work and labor costs.
-
Excellent Chemical & Weather Resistance: Highly resistant to a wide range of chemicals, moisture, and UV radiation, ensuring long-term performance.
-
Lightweight & Easy Handling: Significantly lighter than steel, enabling faster installation, disassembly, and reduced manpower.
-
Material: High-Grade Acrylonitrile Butadiene Styrene (ABS)
-
Standard Size: Customizable, common 1220x2440mm / 4x8ft
-
Thickness Range: 10mm to 20mm
-
Reuse Cycles: 80+ times
-
Service Temperature: -30°C to 80°C
-
Premium Performance: Superior to PP in impact strength and thermal stability, suitable for high-cycle, high-stress projects.
-
Lower Lifetime Cost: Highest reuse rate in plastic formwork category delivers the best return on investment.
-
All-Weather Application: Reliable performance in extreme hot or cold climates, with minimal warping or degradation.
Features
|
Item |
Features |
|
Materials |
ABS(Acrylonitrile Butadiene Styrene) |
|
Density |
1.03g/cm³-1.28g/cm³ |
|
Weight |
14kg/sqm |
|
Max Size |
1.2*0.6m |
|
Max Casting Slab Thickness |
300mm |
|
Maximum Load Pressure |
60KN/sqm for wall & 80KN/sqm for column |
|
Operation Temp |
-20℃to +80℃ |
|
Surface Hardness |
94 |
Specifications
|
Name |
Size(Length*Width*Height mm) |
Color |
Weight(KG) |
Material |
|
Panel |
1200*600*75 mm |
Black |
10.1 |
ABS(Acrylonitrile Butadiene Styrene) |
|
400*600*75 mm |
3.7 |
|||
|
350*600*75 mm |
3.4 |
|||
|
300*600*75 mm |
2.7 |
|||
|
250*600*75 mm |
2.5 |
|||
|
200*600*75 mm |
2.2 |
|||
|
180*600*75 mm |
2.1 |
|||
|
300*300*75 mm |
1.4 |
|||
|
300*250*75 mm |
1.3 |
|||
|
300*200*75 mm |
1.25 |
|||
|
300*150*75 mm |
0.7 |
|||
|
250*250*75 mm |
1.13 |
|||
|
250*200*75 mm |
0.9 |
|||
|
200*200*75 mm |
0.8 |
|||
|
200*150*75 mm |
0.6 |
|||
|
Outside Corner Panel |
250*600*75 mm |
2.85 |
||
|
Internal Corner Panel |
250*100*600*75 mm |
3.5 |
||
|
Top Angle Panel |
250*250*100*75 mm |
1.5 |
||
|
Handle |
- |
White |
0.1 |
PA(Polyamides) |
FAQ
a. Are you a trading company or a manufacturer?
- Firstly, we are a subsidiary foreign trade company of a group company, mainly responsible for operating the export business of formwork and scaffolding products for the group company.
- Secondly, our group company has two major production bases, specializing in the production and processing of formwork and scaffolding products for over 20 years.
b. How can I get a quotation?
- If you are a simple concrete pouring project, such as walls, swimming pools, main structures, and basements, and you have your own engineer, you can directly provide us with a bill of materials, and we will provide you with a quotation according to the bill of materials.
-
If you are a concrete pouring project for apartments, residences, villas, etc., and need to use plastic formwork products as a whole, our professional consultants will communicate with you in detail. After you provide us with the engineering architectural drawings and structural drawings, our engineers will develop an application plan for you and provide you with a quotation based on the specific plan.
c. How long does it usually take to complete the plan and quotation after we provide the engineering architectural drawings and structural drawings?
- Generally, it takes about 5-8 days to complete the specific plan and detailed quotation.
d.Can you provide free samples?
- Yes, we can provide samples. You will need to pay for the shipping cost.
e. How long is the estimated delivery time after the contract is signed?
- According to the complexity of the project, it usually takes 30-60 days to complete the stocking. We will estimate a more accurate delivery time for you during the planning and quotation process.
f. Is the plastic template prone to deformation?
- If the construction environment where the project is located belongs to long-term high temperature, the increase in temperature of the concrete pouring project may cause slight deformation of the formwork. It is recommended to use all aluminum alloy formwork or steel frame wood formwork system in high temperature areas.
g. What are the defects of the plastic template system?
- The load force is too small to complete the construction of large-sized concrete structures; Poor high temperature resistance, slight deformation may occur when used in high-temperature areas.
h. What is the payment method you require?
- Payment<=1, 000USD, 100% in advance.
-
Payment>=10, 000USD, 30% T/T in advance ,balance before shipment.
-
Or L/C.
Get in Touch
Have questions about our products or want to discuss a custom order? Our team is ready to help you.