PP Plastic Shuttering Panels 1220x2440mm Plastic Shuttering Board Lightweight
PP Plastic Formwork is a versatile, economical, and reusable construction solution designed for concrete forming. Made from robust polypropylene, it provides a reliable and efficient alternative to traditional wood and steel formwork, widely used in residential buildings, commercial structures, and general construction projects. It balances performance with value, offering excellent durability and ease of use.
- Lightweight and User-Friendly: Extremely easy to handle, transport, and install, reducing labor intensity and accelerating project timelines.
- Excellent Concrete Finish: Ensures a smooth, uniform concrete surface, minimizing the need for additional finishing or plastering work.
- Strong and Durable: Highly resistant to impact, moisture, and common chemicals, with good resistance to bending and cracking under normal construction loads.
- Adaptable Design: Can be easily cut, drilled, and assembled on-site to fit various architectural shapes and complex formwork requirements.
- Material: Polypropylene (PP)
- Standard Size: 1220x2440mm (4x8ft)
- Thickness: Typically 12mm, 15mm, 18mm
- Reuse Cycles: 50+ times
- Temperature Range: -20°C to 60°C
- Outstanding Cost Efficiency: Offers a significantly lower initial investment compared to steel or aluminum formwork, and a much lower cost-per-use than disposable wood panels.
- Sustainable Choice: Fully recyclable, reducing environmental impact and construction waste, aligning with green building standards.
- Proven Reliability: A well-established, trusted product in the global market, known for delivering consistent performance and reliable results on a wide range of projects.
| Production | Material | Size (mm) | Unit Weight (kg/pcs) | Area (m²/pcs) |
|---|---|---|---|---|
| PP Panel | PP | 1500*1200*78 | 27.00 | 1.8000 |
| PP Panel | PP | 1500*1000*78 | 22.50 | 1.5000 |
| PP Panel | PP | 1500*900*78 | 20.25 | 1.3500 |
| PP Panel | PP | 1500*800*78 | 18.00 | 1.2000 |
| PP Panel | PP | 1500*700*78 | 15.75 | 1.0500 |
| PP Panel | PP | 1500*600*78 | 13.50 | 0.9000 |
| PP Panel | PP | 1500*500*78 | 11.25 | 0.7500 |
| PP Panel | PP | 1500*450*78 | 10.13 | 0.6750 |
| PP Panel | PP | 1500*400*78 | 9.00 | 0.6000 |
| PP Panel | PP | 1500*350*78 | 7.88 | 0.5250 |
| PP Panel | PP | 750*150*78 | 2.25 | 0.1125 |
| PP Panel | PP | 750*100*78 | 1.50 | 0.0750 |
| PP Panel | PP | 600*600*78 | 6.84 | 0.3600 |
| PP Panel | PP | 600*500*78 | 5.70 | 0.3000 |
| PP Panel | PP | 500*500*78 | 4.75 | 0.2500 |
| PP Panel | PP | 500*400*78 | 3.80 | 0.2000 |
| PP Panel | PP | 400*400*78 | 3.04 | 0.1600 |
| PP Panel | PP | 300*300*78 | 1.71 | 0.0900 |
| PP Panel | PP | 250*250*78 | 1.19 | 0.0625 |
| PP Panel | PP | 200*200*78 | 0.76 | 0.0400 |
| PP Panel | PP | 150*150*78 | 0.43 | 0.0225 |

Firstly, we are a subsidiary foreign trade company of a group company, mainly responsible for operating the export business of formwork and scaffolding products for the group company.
Secondly, our group company has two major production bases, specializing in the production and processing of formwork and scaffolding products for over 20 years.
If you are a simple concrete pouring project, such as walls, swimming pools, main structures, and basements, and you have your own engineer, you can directly provide us with a bill of materials, and we will provide you with a quotation according to the bill of materials.
If you are a concrete pouring project for apartments, residences, villas, etc., and need to use plastic formwork products as a whole, our professional consultants will communicate with you in detail. After you provide us with the engineering architectural drawings and structural drawings, our engineers will develop an application plan for you and provide you with a quotation based on the specific plan.
Generally, it takes about 5-8 days to complete the specific plan and detailed quotation.
Yes, we can provide samples. You will need to pay for the shipping cost.
According to the complexity of the project, it usually takes 30-60 days to complete the stocking. We will estimate a more accurate delivery time for you during the planning and quotation process.
If the construction environment where the project is located belongs to long-term high temperature, the increase in temperature of the concrete pouring project may cause slight deformation of the formwork. It is recommended to use all aluminum alloy formwork or steel frame wood formwork system in high temperature areas.
The load force is too small to complete the construction of large-sized concrete structures; Poor high temperature resistance, slight deformation may occur when used in high-temperature areas.
Payment ≤ 1,000 USD: 100% in advance.
Payment ≥ 10,000 USD: 30% T/T in advance, balance before shipment.
Or L/C.

Get in Touch
Have questions about our products or want to discuss a custom order? Our team is ready to help you.