Ring Lock Scaffold 300mm Diagonal Brace for System Stability
Product Overview
Ring Lock Scaffold is a heavy-duty modular scaffolding system featuring rosette nodes for rapid assembly. Engineered for high-rise access, bridge falsework, and heavy formwork support, it delivers superior load capacity and safety compared to traditional tube-and-coupler systems.
Features & Functions
- Wedge Lock Mechanism: Horizontal ledgers and diagonal braces connect via a hammer-driven wedge, creating a rigid, non-slip joint without loose bolts or nuts, significantly reducing assembly time and labor costs.
- 8-Direction Connectivity: Each rosette node allows connections in eight directions (0°, 45°, 90°), enabling the construction of curved walls, complex facades, and large-span structures with exceptional geometric flexibility.
- Integrated Diagonal Bracing: The system utilizes dedicated diagonal braces that lock directly into the rosette, forming a triangulated structure that dramatically increases overall stability and lateral load resistance.
- All-Steel Modular Design: Comprising standardized verticals, horizontals, and braces, the system minimizes on-site cutting and adapts to various project phases, from initial shoring to final facade access.
Key Specifications
- Material: Q345B Low-Alloy High-Strength Steel
- Vertical Standard: Ø48.3mm x 3.2mm, Lengths: 0.5m, 1.0m, 1.5m, 2.0m, 2.5m, 3.0m
- Load Capacity: Single leg SWL up to 60 kN (approx. 6 tons), depending on configuration
- Surface: Hot-Dip Galvanized (indoors/outdoors) / Painted
- Standards: Complies with EN 12811, BS 1139, JGJ/T 231
Application Scope
Widely used in bridge engineering including general elevated bridges, tunnel engineering, factory buildings, elevated water towers, power plants, refineries, and special factory building support design. Also suitable for pedestrian overpasses, span sheds, storage shelves, chimneys, water towers, indoor and outdoor decoration, large-scale concert stages, background frames, stands, viewing platforms, styling frames, staircase systems, stage construction, sports competition stands, and various other projects.
Competitive Advantages
- Labor Efficiency: Assembly is 2-3 times faster than traditional scaffolding, significantly reducing on-site labor costs and project timelines.
- Enhanced Safety: The positive wedge lock and rigid node design minimize installation errors and prevent accidental dislodgement, ensuring a safer working platform.
- Long-Term ROI: High durability and reusability across hundreds of projects make it a cost-effective solution for rental companies and large contractors.
- Experienced engineering team with average 10+ years working experience
- Over 20 years of production experience ensuring stable product quality
- Strategic factory location in industrial cluster area providing significant cost advantages
- Full cycle project services ensuring smooth Ring-Lock Scaffold application
Professional Services
- Professional engineering team provides detailed product application solutions
- Expert consultation for optimized engineering application plans
- Dedicated service teams for each project ensuring perfect product-demand matching
- Efficient construction support through timely product delivery
Frequently Asked Questions
- Are you a trading company or manufacturer?
We are a subsidiary foreign trade company of a group company, responsible for exporting formwork and scaffolding products. Our group company operates two major production bases with over 20 years of specialized production experience.
- What services do you provide?
We provide professional implementation solutions, high-quality products, and efficient technical support services in the field of templates and scaffolding.
- Do you provide samples?
Yes, we can provide samples. Customers are responsible for shipping costs.
- How to get a quotation?
Provide specific requirements list, or inform us of your intended product use - we will develop a customized plan based on your needs.
- Quotation and delivery timeline?
Specific quotations typically completed within 2 days. Delivery time after contract signing usually 10-30 days depending on project complexity.
- Payment terms?
T/T 30% deposit before manufacture, 70% balance against B/L Copy, or L/C.