WORKSUN GROUP CO., LTD.
                                                                                                           
Verified Supplier
2 Years
Since 2024-07-30
Menu

Robust Cuplock Scaffolding System Durable High Rise Building Scaffolding 48.3mm OD Tube

Price Negotiable
Price: US $8.90 - 12.00/ Piece
MOQ: 200/Piece
Delivery Time: 10-30 workday
Brand: WKS
Product Description
Cuplock Scaffolding System 48.3mm OD Tube for High Rise Building Facade
Overview

Cuplock Scaffolding is a robust modular system engineered for high-load applications like bridge construction, industrial maintenance, and high-rise building. Its unique cup-and-blade connection mechanism offers superior stability and faster assembly compared to traditional tube-and-coupler systems, making it ideal for projects where both speed and structural integrity are critical.

Features & Functions
  • Fast Hammer-Lock Assembly: Features forged blades on horizontals that slot into fixed cups on verticals, secured by a rotating top cup. This allows for rapid, tool-light assembly of up to four components at a node, drastically cutting labor time.
  • Exceptional Load-Bearing Capacity: The rigid node connection and high-strength steel construction provide excellent vertical load transfer, making it suitable for supporting heavy concrete formwork and material hoists.
  • Modular Flexibility: Standard components can be configured for straight facades, circular structures, stair towers, and large-area shoring platforms with minimal need for custom parts.
  • Enhanced Safety & Durability: Hot-dip galvanized finish ensures long-term corrosion resistance, while the positive mechanical lock reduces the risk of accidental disassembly on site.
Key Specifications
  • Material: High-Tensile Steel Q345 (S355 equivalent)
  • Standard Tube: 48.3mm OD x 3.2mm / 4.0mm Wall Thickness
  • Cup Spacing: 500mm or 600mm intervals on verticals
  • Load Capacity: Up to 55 kN per standard leg (config-dependent)
  • Surface: Hot-Dip Galvanized (HDG) per ASTM A123
Competitive Advantages
  • Optimal Speed-to-Strength Ratio: Delivers the assembly speed of a modular system with the load capacity approaching that of ringlock, offering better value for heavy-duty straight-line projects.
  • Lower Labor Cost: Significantly faster to erect than tube-and-coupler scaffolding, reducing skilled labor requirements and project timelines.
  • Proven Global Standard: Widely used in international infrastructure projects, with components that are fully interchangeable and compliant with EN 12810/12811 standards.
Cuplock Scaffolding System in use
Product Parameters
Standards (Uprights)
Item No. Length Weight Picture
BSCS 300 3m/9'10" 17.5kg/38.25 Ibs BSCS 300 Standard
BSCS 250 2.5 m/8'2" 14.57 kg/32.12 Ibs  
BSCS 200 2m/6'2" 11.82 kg/26.07 Ibs  
BSCS 150 1.5 m/4'11" 9.05 kg/19.95 Ibs  
BSCS 100 1 m/3'3" 6.3 kg/13.91 Ibs  
BSCS O50 0.5m/1'8" 3.5 kg /7.77 Ibs  
Ledgers (Horizontal Braces)
Item No. Length Weight Picture
BSCL 250 2.5 m/8'2" 9.35 kg/20.61 Ib BSCL 250 Ledger
BSCL 180 1.8 m/6' 6.85 kg / 15.1 Ibs  
BSCL 150 1.5 m/4'11" 5.75 kg/9.46 Ibs  
BSCL 120 1.2m/4 4.29 kg/13.91 Ibs  
BSCL 090 0.9m/3' 3.55 kg /7.83 Ibs  
BSCL 060 0.6m/2' 2.47 kg / 5.45 Ibs  
Our Services
  • Customized Production Services: Professional engineering team provides detailed product application solutions based on your project drawings.
  • Timely Response Service: Professional engineers available before, during, and after sales to promptly solve and meet your needs.
  • Worry-Free After-Sales Service: One-on-one service teams to help complete implementation and landing of engineering projects.
Frequently Asked Questions
Are you a trading company or a manufacturer?
We are a subsidiary foreign trade company of a group company, responsible for operating export business of formwork and scaffolding products. Our group has two major production bases with over 20 years of production experience.
How can I get a quotation?
For simple projects with your own engineer, provide a bill of materials. For complex projects like apartments and residences, our consultants will develop an application plan based on your engineering drawings.
How long does it usually take to complete the plan and quotation?
Generally 5-8 days to complete specific plans and detailed quotations.
Can you provide free samples?
Yes, we can provide samples. You will need to pay for the shipping cost.
How long is the estimated delivery time after the contract is signed?
Usually 30-60 days depending on project complexity. More accurate delivery times are provided during planning.
Is the plastic template prone to deformation?
In long-term high temperature environments, slight deformation may occur. We recommend aluminum alloy formwork or steel frame wood formwork for high temperature areas.
What are the defects of the plastic template system?
Limited load capacity for large-sized concrete structures and poor high temperature resistance with potential deformation in high-temperature areas.
What is the payment method you require?
Payments ≤1,000USD: 100% in advance. Payments ≥10,000USD: 30% T/T in advance, balance before shipment. L/C also accepted.
Cuplock Scaffolding system application in construction project

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company WORKSUN GROUP CO., LTD.
Location Beijing Beijing Daxing Room 605, 6th Floor, Building 3, Yard 1, Zhongliang Road, Beijing Economic And Technological Development Zone (Daxing)
Contact Person DanielDong

Request A Quote

Please check your email address.
Your message must be at least 20 characters.