WORKSUN GROUP CO., LTD.
                                                                                                           
Verified Supplier
2 Years
Since 2024-07-30
Menu

High Load Capacity Cuplock Scaffolding System Painted / Galvanized Modular Scaffold System

Price Negotiable
Price: US $8.90 - 12.00/ Piece
MOQ: 200/Piece
Delivery Time: 10-30 workday
Brand: WKS
Product Description
Cuplock Scaffolding with Steel Plank and Guardrail for Safe Working Platform
Cuplock Scaffolding is a heavy-duty modular scaffolding system featuring a patented cup-lock connection. Designed for commercial construction, bridge work, and formwork support, it provides superior load capacity and stability for high-rise projects and industrial applications requiring safe, efficient access platforms.
Features & Functions
  • Cup-Lock Quick Connection: Horizontal ledgers lock into vertical standards with a twist of the top cup, enabling rapid tool-free assembly without nuts or bolts. This speeds up construction and reduces labor costs.
  • High Load Capacity: Engineered to support heavy loads from materials, equipment, and workers, making it ideal for concrete pouring support, masonry work, and large facade installations.
  • Stable Grid Structure: Uniform 500mm or 1000mm node spacing creates a rigid, wobble-free platform that ensures worker safety and stability at significant heights.
  • Modular Flexibility: Components are easily configurable for straight walls, towers, and large-area decks, adapting efficiently to various project layouts and complex structures.
Key Specifications
  • Material: Q235 or Q345 Steel
  • Standard Tube: 48.3mm Outer Diameter
  • Wall Thickness: 2.75mm to 3.2mm
  • Node Spacing: 500mm or 1000mm
  • Load Capacity: Up to 4.5 kN/m²
  • Surface: Hot-Dip Galvanized
Competitive Advantages
  • Fast Assembly & Dismantling: The cup-lock mechanism allows quicker setup and teardown than traditional tube-and-coupler systems, reducing project timelines and labor expenses.
  • Enhanced Safety & Stability: The rigid grid structure and secure connections minimize platform movement, providing a safer working environment for high-altitude tasks.
  • Cost-Effective Reusability: High durability and minimal component loss ensure long service life and low maintenance, offering excellent return on investment for rental companies and contractors.
Cuplock Scaffolding System
Product Parameters
Standards (Uprights)
Item No. Length Weight Picture
BSCS 300 3m/9'10" 17.5kg/38.25 Ibs BSCS 300 Standard
BSCS 250 2.5 m/8'2" 14.57 kg/32.12 Ibs  
BSCS 200 2m/6'2" 11.82 kg/26.07 Ibs  
BSCS 150 1.5 m/4'11" 9.05 kg/19.95 Ibs  
BSCS 100 1 m/3'3" 6.3 kg/13.91 Ibs  
BSCS O50 0.5m/1'8" 3.5 kg /7.77 Ibs  
Ledgers (Horizontal Braces)
Item No. Length Weight Picture
BSCL 250 2.5 m/8'2" 9.35 kg/20.61 Ib BSCL 250 Ledger
BSCL 180 1.8 m/6' 6.85 kg / 15.1 Ibs  
BSCL 150 1.5 m/4'11" 5.75 kg/9.46 Ibs  
BSCL 120 1.2m/4 4.29 kg/13.91 Ibs  
BSCL 090 0.9m/3' 3.55 kg /7.83 Ibs  
BSCL 060 0.6m/2' 2.47 kg / 5.45 Ibs  
Our Services
  • Customized Production Services: Professional engineering team provides detailed product application solutions based on your project drawings.
  • Timely Response Service: Professional engineers available before, during, and after sales to promptly solve and meet your needs.
  • Worry-Free After-Sales Service: One-on-one service teams to help complete implementation and landing of engineering projects.
Frequently Asked Questions
Are you a trading company or a manufacturer?
We are a subsidiary foreign trade company of a group company, responsible for operating export business of formwork and scaffolding products. Our group has two major production bases with over 20 years of production experience.
How can I get a quotation?
For simple projects with your own engineer, provide a bill of materials. For complex projects like apartments and residences, our consultants will develop an application plan based on your engineering drawings.
How long does it usually take to complete the plan and quotation?
Generally 5-8 days to complete specific plans and detailed quotations.
Can you provide free samples?
Yes, we can provide samples. You will need to pay for the shipping cost.
How long is the estimated delivery time after the contract is signed?
Usually 30-60 days depending on project complexity. More accurate delivery times are provided during planning.
Is the plastic template prone to deformation?
In long-term high temperature environments, slight deformation may occur. We recommend aluminum alloy formwork or steel frame wood formwork for high temperature areas.
What are the defects of the plastic template system?
Limited load capacity for large-sized concrete structures and poor high temperature resistance with potential deformation in high-temperature areas.
What is the payment method you require?
Payments ≤1,000USD: 100% in advance. Payments ≥10,000USD: 30% T/T in advance, balance before shipment. L/C also accepted.
Cuplock Scaffolding system application in construction project

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company WORKSUN GROUP CO., LTD.
Location Beijing Beijing Daxing Room 605, 6th Floor, Building 3, Yard 1, Zhongliang Road, Beijing Economic And Technological Development Zone (Daxing)
Contact Person DanielDong

Request A Quote

Please check your email address.
Your message must be at least 20 characters.