Versatile Construction Formwork Accessories Lightweight / Heavy Duty Formwork Fasteners
Price:
US $1.00 - 2.00/ Piece
MOQ:
200 Piece
Delivery Time:
10-30 workday
Brand:
WKS
Product Description
Formwork Accessory For Concrete Shoring And Wall Construction Projects
Formwork Accessories are the critical hardware components—including tie rods, clamps, bolts, and anchors—that secure concrete formwork systems. They ensure structural integrity during pouring by resisting lateral pressure, preventing formwork deformation, and guaranteeing precise dimensional accuracy in walls, columns, and slabs.
Key Features & Functions
- High Tensile Strength: Engineered to withstand extreme concrete hydrostatic pressure, eliminating the risk of blowouts or burst formwork during high-volume pours.
- Reusability & Versatility: Hot-dip galvanized steel components offer multiple safe reuse cycles across various formwork systems (aluminum, steel, timber), reducing per-project costs.
- Quick Assembly: Standardized threads and designs enable rapid installation and stripping, significantly accelerating project timelines for large-scale construction.
Technical Parameters
- Material: High-tensile steel (Q235, Q345, 45#), with optional hot-dip galvanizing for corrosion resistance.
- Common Types: Through-tie rods (M12-M20), snap ties, she-bolts, formwork clamps, and cone anchors.
- Load Capacity: Tie rods typically rated 90kN-120kN, compliant with EN, ASTM, and OSHA standards.
Competitive Advantages
Our accessories provide full compatibility with major formwork brands, ensuring seamless integration. With rigorous quality control and a complete product range, we deliver the reliability needed for high-rise, bridge, and infrastructure projects, minimizing downtime and ensuring on-schedule completion.
Product Specifications
| Product | Specifications & Features | Function |
|---|---|---|
Wedge & Pin
|
|
Fastening device used to securely link all aluminum alloy panels together. |
Tie-Rod
|
|
Connecting device for firmly linking wall panels in various formwork systems. |
Wing Nut & Anchor Nut
|
|
Used with tie rods to securely link wall and column panels in formwork systems. |
Adjustable Column Formwork Clamp
|
|
Used in column formwork systems to secure panels and prevent deviation. |
Formwork Clamp
|
|
Used in steel frame formwork systems to link and secure wall panels tightly. |
Rapid Formwork Clamp
|
|
Used in steel frame formwork systems for quick linking and securing of wall panels. |
Adjustable Steel Prop
|
|
Supports slab panels and adjusts them to the same horizontal plane in slab formwork systems. |
Push-Pull Prop
|
|
Supports wall panels and ensures proper alignment in formwork systems. |
Flat Wall Tie
|
|
Links wall panels and ensures accurate positioning in aluminum alloy formwork systems. |
Steel Prop Fork-Head
|
|
Supports H20 timber beams in H20 timber beam formwork systems. |
Prop Nut
|
|
Adjusts steel props in formwork support systems. |
Frequently Asked Questions
Are you a trading company or a manufacturer?
We are a subsidiary foreign trade company of a group company, responsible for exporting formwork and scaffolding products. Our group has two production bases with over 32 years of manufacturing experience.
What do you do?
We provide professional implementation solutions, high-quality products, and efficient technical support services in formwork and scaffolding.
Do you provide samples? Is the sample chargeable or free?
Yes, we provide samples. Customers are responsible for shipping costs.
What do you need to make a brief design and quotation for our construction project?
We require architectural and structural drawings of the project.
How to get quotation?
For simple projects with your own engineer, provide a bill of materials. For complex projects like apartments and residences, our consultants will develop application plans based on your drawings.
How long does it take to make a brief design and quotation after providing structural drawings?
Typically 5-8 days to complete specific plans and detailed quotations.
How long is the estimated delivery time after contract signing?
Usually 30-60 days for stocking completion, depending on project complexity.
What are your payment terms?
T/T 30% deposit before manufacture, 70% balance against B/L Copy, or L/C.

Get in Touch
Have questions about our products or want to discuss a custom order? Our team is ready to help you.
Company
WORKSUN GROUP CO., LTD.
Location
Beijing Beijing Daxing Room 605, 6th Floor, Building 3, Yard 1, Zhongliang Road, Beijing Economic And Technological Development Zone (Daxing)
Contact Person
DanielDong