Aluminum Formwork Tie Rods Reusable Shuttering Tie Bars For Lightweight And Rapid Assembly Solutions
Price:
US $1.00 - 2.00/ Piece
MOQ:
200 Piece
Delivery Time:
10-30 workday
Brand:
WKS
Product Description
Aluminum Formwork Accessory For Lightweight And Rapid Assembly Solutions
High Strength Steel Formwork Accessory
Aluminum Formwork Accessory: High-Strength Connection System
Aluminum Formwork Accessories are precision-engineered components designed to securely connect and lock aluminum formwork panels. These critical parts ensure the structural integrity of the formwork system during concrete pouring, guaranteeing dimensional accuracy and leak-free construction for high-rise buildings and civil engineering projects.
Key Features & Functions
- Rapid Assembly: Utilizes a pin-and-wedge mechanism for tool-free, rapid installation and dismantling, significantly reducing on-site labor time.
- Secure Locking: High-tensile steel construction provides exceptional clamping force, preventing panel separation under high concrete pressure.
- Universal Compatibility: Standardized dimensions ensure seamless integration with major aluminum formwork systems (both bolt and types).
Technical Parameters
- Material: High-carbon steel (Q235 / 45#) or alloy steel, with hot-dip galvanized or electro-galvanized finish for corrosion resistance.
- Core Components: Includes pins (Φ12-16mm), wedges, bolts (M16, M18, M20), and specialty washers.
- Load Capacity: Designed to withstand lateral concrete pressures exceeding 60 kN/m².
- Standards: Compliant with JGJ 386-2016 and international formwork specifications.
Competitive Advantages
Our accessories offer superior wear resistance and batch-to-batch consistency, ensuring over 300 reuse cycles without failure. With full compatibility across systems, they reduce project downtime and provide a cost-effective solution for fast-track construction schedules.
Product Specifications
| Product | Specifications & Features | Function |
|---|---|---|
Wedge & Pin |
|
Fastening device used to securely link all aluminum alloy panels together. |
Tie-Rod |
|
Connecting device for firmly linking wall panels in various formwork systems. |
Wing Nut & Anchor Nut |
|
Used with tie rods to securely link wall and column panels in formwork systems. |
Adjustable Column Formwork Clamp |
|
Used in column formwork systems to secure panels and prevent deviation. |
Formwork Clamp |
|
Used in steel frame formwork systems to link and secure wall panels tightly. |
Rapid Formwork Clamp |
|
Used in steel frame formwork systems for quick linking and securing of wall panels. |
Adjustable Steel Prop |
|
Supports slab panels and adjusts them to the same horizontal plane in slab formwork systems. |
Push-Pull Prop |
|
Supports wall panels and ensures proper alignment in formwork systems. |
Flat Wall Tie |
|
Links wall panels and ensures accurate positioning in aluminum alloy formwork systems. |
Steel Prop Fork-Head |
|
Supports H20 timber beams in H20 timber beam formwork systems. |
Prop Nut |
|
Adjusts steel props in formwork support systems. |
Frequently Asked Questions
Are you a trading company or a manufacturer?
We are a subsidiary foreign trade company of a group company, responsible for exporting formwork and scaffolding products. Our group has two production bases with over 32 years of manufacturing experience.
What do you do?
We provide professional implementation solutions, high-quality products, and efficient technical support services in formwork and scaffolding.
Do you provide samples? Is the sample chargeable or free?
Yes, we provide samples. Customers are responsible for shipping costs.
What do you need to make a brief design and quotation for our construction project?
We require architectural and structural drawings of the project.
How to get quotation?
For simple projects with your own engineer, provide a bill of materials. For complex projects like apartments and residences, our consultants will develop application plans based on your drawings.
How long does it take to make a brief design and quotation after providing structural drawings?
Typically 5-8 days to complete specific plans and detailed quotations.
How long is the estimated delivery time after contract signing?
Usually 30-60 days for stocking completion, depending on project complexity.
What are your payment terms?
T/T 30% deposit before manufacture, 70% balance against B/L Copy, or L/C.

Get in Touch
Have questions about our products or want to discuss a custom order? Our team is ready to help you.
Company
WORKSUN GROUP CO., LTD.
Location
Beijing Beijing Daxing Room 605, 6th Floor, Building 3, Yard 1, Zhongliang Road, Beijing Economic And Technological Development Zone (Daxing)
Contact Person
DanielDong
Wedge & Pin
Tie-Rod
Wing Nut & Anchor Nut
Adjustable Column Formwork Clamp
Formwork Clamp
Rapid Formwork Clamp
Adjustable Steel Prop
Push-Pull Prop
Flat Wall Tie
Steel Prop Fork-Head
Prop Nut