Customized Construction Formwork Accessories Silver Formwork Clamp For Slab Support
Price:
US $1.00 - 2.00/ Piece
MOQ:
200 Piece
Delivery Time:
10-30 workday
Brand:
WKS
Product Description
Formwork Accessory Components For Slab Support And Beam Shoring Systems
Construction Formwork Accessories are essential hardware components—including tie rods, clamps, nuts, and spacers—used to secure and align formwork systems during concrete casting. These high-strength parts ensure dimensional accuracy, prevent concrete leakage, and withstand high hydrostatic pressure in building foundations, walls, and columns.
Key Features & Functions
- High Load Capacity: Manufactured from Q235 steel or QT500-7 cast iron, these accessories provide tensile strength to resist concrete bursting pressure, with tie rod breaking loads ranging from 90kN to over 250kN depending on diameter.
- Reusable & Corrosion-Resistant: Hot-dip galvanized or electroplated surface treatment ensures durability for multiple reuse cycles, reducing long-term project costs.
- Quick Assembly System: Standardized threads (e.g., M12, M16, M20) and rapid clamps enable fast installation and stripping, minimizing on-site labor time.
Technical Parameters
- Tie Rods: Standard diameters 12mm, 16mm, 20mm; lengths customizable from 1m to 6m.
- Clamps & Nuts: Forged or cast components with precise threading; compatible with timber, steel, and aluminum formwork.
- Standards: Designed to meet international construction safety requirements for formwork systems.
Competitive Advantages
Our accessories offer full compatibility with major formwork brands, ensuring seamless integration. With strict quality control on raw materials and threading precision, we deliver reliable performance for high-rise buildings and infrastructure projects, significantly reducing the risk of formwork failure and concrete defects.
Product Specifications
| Product | Specifications & Features | Function |
|---|---|---|
Wedge & Pin
|
|
Fastening device used to securely link all aluminum alloy panels together. |
Tie-Rod
|
|
Connecting device for firmly linking wall panels in various formwork systems. |
Wing Nut & Anchor Nut
|
|
Used with tie rods to securely link wall and column panels in formwork systems. |
Adjustable Column Formwork Clamp
|
|
Used in column formwork systems to secure panels and prevent deviation. |
Formwork Clamp
|
|
Used in steel frame formwork systems to link and secure wall panels tightly. |
Rapid Formwork Clamp
|
|
Used in steel frame formwork systems for quick linking and securing of wall panels. |
Adjustable Steel Prop
|
|
Supports slab panels and adjusts them to the same horizontal plane in slab formwork systems. |
Push-Pull Prop
|
|
Supports wall panels and ensures proper alignment in formwork systems. |
Flat Wall Tie
|
|
Links wall panels and ensures accurate positioning in aluminum alloy formwork systems. |
Steel Prop Fork-Head
|
|
Supports H20 timber beams in H20 timber beam formwork systems. |
Prop Nut
|
|
Adjusts steel props in formwork support systems. |
Frequently Asked Questions
Are you a trading company or a manufacturer?
We are a subsidiary foreign trade company of a group company, responsible for exporting formwork and scaffolding products. Our group has two production bases with over 32 years of manufacturing experience.
What do you do?
We provide professional implementation solutions, high-quality products, and efficient technical support services in formwork and scaffolding.
Do you provide samples? Is the sample chargeable or free?
Yes, we provide samples. Customers are responsible for shipping costs.
What do you need to make a brief design and quotation for our construction project?
We require architectural and structural drawings of the project.
How to get quotation?
For simple projects with your own engineer, provide a bill of materials. For complex projects like apartments and residences, our consultants will develop application plans based on your drawings.
How long does it take to make a brief design and quotation after providing structural drawings?
Typically 5-8 days to complete specific plans and detailed quotations.
How long is the estimated delivery time after contract signing?
Usually 30-60 days for stocking completion, depending on project complexity.
What are your payment terms?
T/T 30% deposit before manufacture, 70% balance against B/L Copy, or L/C.

Get in Touch
Have questions about our products or want to discuss a custom order? Our team is ready to help you.
Company
WORKSUN GROUP CO., LTD.
Location
Beijing Beijing Daxing Room 605, 6th Floor, Building 3, Yard 1, Zhongliang Road, Beijing Economic And Technological Development Zone (Daxing)
Contact Person
DanielDong