WORKSUN GROUP CO., LTD.
                                                                                                           
Verified Supplier
2 Years
Since 2024-07-30
Menu

High Capacity 120 kN Maximum Leg Load Cuplock Scaffolding System with Hot-Dip Galvanized Finish for Easy Assembling

Price Negotiable
Price: US $8.90 - 12.00/ Piece
MOQ: 200/Piece
Delivery Time: 10-30 workday
Brand: WKS
Product Description
High Capacity Cuplock Scaffolding for Formwork Falsework Support
Product Overview

The Cuplock Scaffolding System is a proven modular steel scaffold widely adopted for general construction, bridge falsework, and heavy-load formwork support. Its distinctive cup-and-blade connection mechanism enables rapid assembly with a simple hammer blow. Manufactured from high-strength steel with a hot-dip galvanized finish, this system delivers reliable performance across thousands of project sites worldwide.

With a maximum leg load of 120 kN and full compliance with international scaffolding standards, Cuplock scaffolding offers an optimal balance of strength, speed, and cost-effectiveness for mid-to-large scale construction projects.

Key Advantages
  • 120 kN Maximum Leg Load - Handles heavy concrete pours and material loads with confidence
  • Cup-and-Blade Locking - Upper cup hammered down over lower cup; secure connection in under 5 seconds
  • 90° Fixed Connections - Ideal for rectangular building perimeters and standard grid layouts
  • Hot-Dip Galvanized Finish - Provides long-term corrosion resistance without painting
  • Low Component Count - Only 4 basic types: standards, ledgers, diagonals, and base jacks
  • Internationally Certified - Meets rigorous international scaffolding standards for safety and quality
Customization Capabilities

We offer full customization to suit your project requirements:

  • Standard lengths: 1.0m, 1.5m, 2.0m, 2.5m, 3.0m
  • Ledger sizes: 0.6m to 2.4m in various increments
  • Diagonal brace sizes based on ledger combinations
  • Surface finish: Hot-dip galvanized (standard) or painted
  • Accessories: Base jacks, U-head top jacks, toe boards, guardrails, ladder access systems
Technical Specifications
Parameter Specification
Material High-Strength Steel
Vertical Pipe Heavy-duty steel pipe with precision welding
Cup Spacing 1.0m intervals on standards
Cup Type Fixed lower cup + sliding upper cup (welded)
Blade (Spigot) Welded to ledger and diagonal ends
Max Leg Load 120 kN (at 1.2m × 1.2m spacing)
Finish Hot-dip galvanized (heavy-duty coating)
Quality Assurance Internationally recognized quality standards
Load Capacity Reference
Leg Spacing Max Safe Working Load
1.2m × 1.2m 100 - 120 kN
1.5m × 1.5m 60 - 80 kN
1.8m × 1.8m 40 - 50 kN

Load capacity decreases with height; engineering calculation required for project-specific designs.

Typical Applications
  • Building facade access scaffolding
  • Slab and beam formwork falsework
  • Bridge pier and abutment support
  • Industrial plant maintenance access
  • Stair towers and pedestrian bridges
  • Event staging and grandstands
Quality Assurance
  • Certified to meet international quality standards
  • Factory-direct production with strict quality control
  • Hot-dip galvanized finish for superior corrosion resistance
Lead Time & Minimum Order
  • Standard orders: 15-20 days
  • Custom projects: 20-35 days
  • Factory direct - volume discounts available
High Capacity Cuplock Scaffolding System for construction projects

Contact us for a tailored solution and quick quote

Send Inquiry

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company WORKSUN GROUP CO., LTD.
Location Beijing Beijing Daxing Room 605, 6th Floor, Building 3, Yard 1, Zhongliang Road, Beijing Economic And Technological Development Zone (Daxing)
Contact Person DanielDong

Request A Quote

Please check your email address.
Your message must be at least 20 characters.