42MW Industrial Gas Turbine Customized GE MS6001B Gas Turbine With 17962 Hours Heavy Oil Operation
Price:
To Be Negotiated
MOQ:
1 Piece
Delivery Time:
To Be Negotiated
Brand:
Huanxiang
Product Description
Used GE MS6001B Gas Turbine with 42MW Power Output 17,962 Hours Heavy Oil Operation and ABB Generator
Product Overview
This GE MS6001B gas turbine package includes a 42MW power output unit with 17,962 hours of heavy oil operation and an ABB generator. The unit (No.1 PG6581B) commenced commercial operation in September 2004.
Technical Specifications
| Power Output | 42MW (ISO conditions, natural gas) |
|---|---|
| Operation Hours | 17,962 hours (heavy oil) + 465 hours (light oil) = 18,427 total hours |
| Generator | ABB Generator |
| Commission Date | September 2004 |
Operational History
As of January 1, 2018:
• 867 successful ignition starts
• 894 total startups
• 84 tripping incidents
• 0 hours of natural gas operation
• 867 successful ignition starts
• 894 total startups
• 84 tripping incidents
• 0 hours of natural gas operation
Product Image

Get in Touch
Have questions about our products or want to discuss a custom order? Our team is ready to help you.
Company
Chongqing Huanxiang Industrial. Co., Ltd.
Location
Floor 3,No.228,Liang Gang Avenue of Hui Xing Street,Yubei District,Chongqing of China 401120
Contact Person
Tom Hu