Chongqing Huanxiang Industrial. Co., Ltd.
                                                                                                           
Verified Supplier
9 Years
Since 2017
Menu

42MW Industrial Gas Turbine Customized GE MS6001B Gas Turbine With 17962 Hours Heavy Oil Operation

Price Negotiable
Price: To Be Negotiated
MOQ: 1 Piece
Delivery Time: To Be Negotiated
Brand: Huanxiang
Product Description
Used GE MS6001B Gas Turbine with 42MW Power Output 17,962 Hours Heavy Oil Operation and ABB Generator
Product Overview
This GE MS6001B gas turbine package includes a 42MW power output unit with 17,962 hours of heavy oil operation and an ABB generator. The unit (No.1 PG6581B) commenced commercial operation in September 2004.
Technical Specifications
Power Output 42MW (ISO conditions, natural gas)
Operation Hours 17,962 hours (heavy oil) + 465 hours (light oil) = 18,427 total hours
Generator ABB Generator
Commission Date September 2004
Operational History
As of January 1, 2018:
• 867 successful ignition starts
• 894 total startups
• 84 tripping incidents
• 0 hours of natural gas operation
Product Image
GE MS6001B Gas Turbine with ABB Generator

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company Chongqing Huanxiang Industrial. Co., Ltd.
Location Floor 3,No.228,Liang Gang Avenue of Hui Xing Street,Yubei District,Chongqing of China 401120
Contact Person Tom Hu

Request A Quote

Please check your email address.
Your message must be at least 20 characters.