Chongqing Huanxiang Industrial. Co., Ltd.
                                                                                                           
Verified Supplier
9 Years
Since 2017
Menu

1 Tons - 20 Tons Medical Waste Incinerator Direct Fired Hospital Waste Incinerator

Price Negotiable
Price: To Be Negotiated
MOQ: 1 Piece
Delivery Time: To Be Negotiated
Brand: Huanxiang
Product Description
Customized 1-20 Tons Direct-Fired Medical Waste Incinerator With High-Temperature Combustion And Water-Cooled System
System Composition

Complete incineration system including:

  • Primary combustion chamber
  • Secondary combustion chamber and dust collector
  • Dust removal device
  • Various connecting elbows and flue
  • Exhaust fan and independent chimney
  • Diesel delivery system
  • Ignition temperature control burner
  • Secondary burner
  • Blower and air supply system
  • Pipeline platform
  • Secondary room operating platform
  • Temperature control system
  • Electrical system and instrument control system
  • Platform and support required for system installation and maintenance
Medical waste incinerator system overview
Process Flow

The waste is fed into the main furnace body where it undergoes complete combustion under high temperature and vortex jets. Following the 3T principle (temperature, time, vortex), the waste is fully gasified, oxidized, pyrolyzed, and burned in a single process.

The high-temperature exhaust gas enters the secondary combustion chamber and dust collector, where it undergoes further combustion at 1200-1400°C to ensure complete destruction of contaminants. The main furnace body utilizes a water-cooled circulation system to maintain flue gas temperature below 1000°C.

Flue gas then proceeds through the cyclone dust removal system using dry absorption methods to remove heavy metals and small particles. After cyclone dust removal, the gas enters a water curtain spray cooling system to reduce temperature below 300°C.

Finally, the flue gas passes through the bag dust removal system to remove fine dust particles. The up-to-standard gas is introduced into the chimney via the exhaust system and safely discharged into the atmosphere. The resulting ash is removed by the ash removal device, screened, and transferred to landfill.

Project Examples
Medical waste incinerator installation project 1 Medical waste incinerator installation project 2 Medical waste incinerator installation project 3 Medical waste incinerator installation project 4

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company Chongqing Huanxiang Industrial. Co., Ltd.
Location Floor 3,No.228,Liang Gang Avenue of Hui Xing Street,Yubei District,Chongqing of China 401120
Contact Person Tom Hu

Request A Quote

Please check your email address.
Your message must be at least 20 characters.