F. T Cable Co., Ltd.
                                                                                                           
Verified Supplier
2 Years
Since 2024
Menu

High Voltage YJV22 1KV 8.7KV 36KV 3 X 70/95/120 Copper Core XLPE PVC Insulated Cable

Price Negotiable
Price: usd 3 ~ 20/ meter
MOQ: 100
Delivery Time: 30 days
Brand: F.T
Product Description

High Voltage Cable YJV22 1KV/8.7KV/36KV 3*70/95/120 Copper Core XLPE PVC Insulated Cable

Product Description

The maximum rated temperature of the cable conductor is 90 ° C. During a short circuit (with a maximum duration of no more than 5 seconds), the maximum rated temperature of the cable conductor is

2.The temperature should not exceed 250 ° C. The ambient temperature during cable laying should not be lower than 0 ° C 3. Allowable bending radius during laying: Single core cables shall not be less than 15 times the outer diameter of the cable; Multi core cable not less than 10 times the outer diameter of the cable

 

Feature YJV YJV22
Conductor Copper core Copper core
Insulation XLPE XLPE
Armor None Steel tape armor
Mechanical Use Light‑duty (bridges, conduits) Heavy‑duty (burial, industrial)
Bending Radius ≥6×OD ≥10×OD
Corrosion Protection PVC‑only Steel + PVC (enhanced)
Cost Lower Higher (+20‑30%)
Typical Applications Offices, short runs Mines, factories, direct burial
Key Advantage Cost‑effective for simple jobs Durability for harsh environments

 

Application Fields

  • Urban & Rural Power Grid – 1KV for communities; 8.7KV/36KV for urban trunk grids, underground corridors (direct burial/tunnel laying).
  • Industrial Parks – Chemical plants, steel mills, mines: 8.7KV/36KV for high-power transmission; 1KV for internal distribution.
  • New Energy Power Stations – PV, wind and energy storage stations: 8.7KV/36KV for power collection/grid connection; 1KV for auxiliary power.
  • Infrastructure – High-speed railways, airports, ports: Power for tunnels, stations (anti-mechanical damage).
  • Public & Commercial Buildings – 1KV for hospitals, malls, offices; 8.7KV for large stadiums’ main power input.
  • Special Engineering – Underground pipe galleries, mountainous areas, water conservancy projects (resists complex conditions).

FAQ

Q1: What’s the difference between 1KV/8.7KV/36KV?
A: 1KV (low-voltage distribution); 8.7KV (medium-voltage transmission); 36KV (high-voltage trunk grids). Choose by project voltage and distance.
Q2: Why 3*70/95/120mm²?
A: Most in-demand specs. 3*70 for small industrial; 3*95 for medium transmission; 3*120 for long-distance, low voltage drop.
Q3: Suitable for direct burial?
A: Yes. Steel tape armor + PVC sheath resists corrosion/pressure/rodents. Recommended burial depth ≥0.7m.
Q4: Certifications for bulk orders?
A: Yes. IEC certifications + TÜV/SGS third-party reports, meeting global import and tender requirements.
Q5: Bulk delivery time?
A: In-stock specs: 3-7 working days; customized: 7-15 working days (depends on quantity).
Q6: Customization available?
A: Yes. Customize length, sheath material, flame-retardant grade and cross-section.

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company F. T Cable Co., Ltd.
Location No. 9-1, Fengxi Science and Technology Park, No. 1999 North Fengpei Road, Fengxi New City, Xixian New Area, Shaanxi Province, China
Contact Person Zhang

Request A Quote

Please check your email address.
Your message must be at least 20 characters.