Chongqing Laishun Machinery Manufacturing Co., Ltd
                                                                                                           
Verified Supplier
15 Years
Since 2011
Menu

3T/H Multi Stage Centrifugal Compressor Lubricated MVR Evaporator System

Price Negotiable
Price: Single item,250000 USD
MOQ: 1 Pcs
Delivery Time: 60-90 days
Brand: LAISHUN
Product Description
Fully Customized Steam Compressor for 3T/H Two-Stage Hot Water Flash Evaporation System

The fully customized 3T/H two-stage hot water flash evaporation system utilizes a steam compressor with the following specifications:

  • Inlet steam temperature: 95°C
  • Inlet pressure: 84.6 kPa
  • Exhaust temperature: 120°C
  • Exhaust pressure: 198.7 kPa
  • Installed power: 160 kW
  • Single ton steam consumption: 48 kW·h
  • Mechanical seal
Compressor Features

Gear speed integrated multi-stage compressor with imported guide vane pre-rotation, automatic control, and constant back pressure with adjustable air volume range of 70%~100%, designed for process gas compression.

  • Imported guide vane automatic constant pressure control air volume
  • Remote monitoring service with automatic control
  • 70%~100% adjustable air volume
  • Automatic anti-surge protection
  • Compact structure and easy maintenance
  • Compressed air is oil-free, with stable pressure and low noise
  • Customized services according to customer needs
Steam Compressor Application Performance

Compared to other types of evaporators, MVR evaporators offer the lowest energy consumption, small footprint, minimal impact on product quality, simple control system, and high stability.

Type Single Effect Evaporator Multi-Effect Evaporator MVR Evaporator
Energy Consumption High energy consumption, theoretically 1 ton of steam required to evaporate 1 ton of water More energy-efficient, energy consumption decreases with efficiency increases Most energy-efficient technology, requires only 15-50 kW·h of electricity per ton of water
Floor Area Small Large Small
Impact on Product Quality Short dwell time, high temperature, minimal impact Long dwell time, high temperature, minimal impact Short residence time, evaporation due to temperature difference, minimal impact
Energy Mode Steam heating requiring steam pipeline network and boiler Steam heating requiring steam pipeline network and boiler Electricity only, no steam pipe network required, fully self-closing circulation system
Operating Cost High Higher Low
Stability Poor Poor Good

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company Chongqing Laishun Machinery Manufacturing Co., Ltd
Location No. 158-5 Donghe Road, Degan Street Industrial Park, Jiangjin District, Chongqing (Building 1-1, Laishun Machinery Manufacturing Plant 1)
Contact Person Guo

Request A Quote

Please check your email address.
Your message must be at least 20 characters.