Strong Power Safe Control Crawler Water Well Drilling Rig For Borehole Construction
Price:
Negotiation
MOQ:
1 set
Delivery Time:
7-12 days
Brand:
JINZHOU SHITAN
Product Description
GK200 Crawler Mounted Rock Drilling Rig
Strong Power Safe Control Crawler Mounted Rock Drilling Rig For Borehole Construction
Product Description
GK200 Crawler Mounted Rock Drilling Rig with a depth of 200 meters and hole diameter from 75mm-300mm. Features wheeled walking mechanism for convenient transport and level adjustment, pressure gauge display for monitoring drill hole conditions, ball card holding mechanism for continuous rod operation, and high working efficiency with convenient, safe, and reliable operation.
Technical Specifications
| Parameter | Specifications |
|---|---|
| Drilling hole diameter (mm) | 75, 91, 110, 130, 150, 300 |
| Drilling depth (m) | 200, 150, 100, 70, 50, 30 |
| Drill pipe diameter (mm) | 42, 50 |
| Drilling angle (°) | 90~75 |
| Equipment size (L × B × H) | 1730 × 860 × 1360 (mm) |
| Rig weight (except engine) | 700 kg |
| Gyrator Specifications | |
| Spindle speed (four gear) (r/min) | 115, 230, 505, 1010 |
| Spindle travel (mm) | 450 |
| Spindle no-load lifting maximum speed (m/s) | 0.05 |
| Spindle no-load drop maximum speed (m/s) | 0.067 |
| Spindle maximum feed pressure (KN) | 15 |
| Spindle maximum lifting force (KN) | 25 |
| Spindle maximum output torque (KN•m) | 1.5 |
Main Features
Hydraulic cylinder feed engine for higher drilling efficiency and labor savings
53×59 drilling rod with high rigidity and strong delivery torque
Vertical spindle fixed by four bearing groups for rigidity in complex geological conditions
160L/min mud pump for cost savings and compact structure
Concentrated handle, small footprint, light weight, strong decomposition, easy mobility
Applications
Suitable for geological survey, geological core drilling, small grouting holes, blasting holes, and small water well holes in railway, water conservancy, bridge, dam foundation, and other construction projects. Primarily used for geological investigation, road and building foundation exploration, concrete structure holes, river levees, civil wells, and earth temperature central air conditioning systems.
Operational Considerations
After well completion, pumping tests verify results with stable water level duration of at least eight hours. Construction sites require proper drainage, making rainy season operation unsuitable. Excavation slopes should follow soil mechanical properties (typically 1:1.5 ratio). For wells with shaft wall water inflow, proper inlet hole and filter layer arrangement is essential, with backfill meeting specific requirements including winter frozen soil limitations.
Product Gallery
Manufacturer Information
Jinzhou Shitan Machinery Equipment Co., Ltd.
Main Products: Pneumatic Drilling Rig / Air Drilling Rig (ST-180, ST-200, ST-260, ST-300, ST-350, ST-400, ST-450, ST-500, ST-600, ST-800), Crawler Water Well Drilling Rig / Trailer Mounted Drilling Rig / Water Well Drilling Rig / Hydraulic Borewell Machine / Hard Rock Drilling Equipment / Diamond Core Drill Rig / Geological Drilling Rig / Soil Testing Drilling Rig / Portable Water Well Drilling Rig (ST-30, ST-50, XY-1A, XY-1B, XY-2, XY-2B, GK180, GK200, GY150, GY200), 30 impact drill rig, ZLJ series tunnel drilling rig, Crawler Track Undercarriage, Drilling Mud Pump (BW150, BW160, BW200, BW250, BW850 series), Drilling Air Compressor, Water Well Drill Bits (PDC Drill Bit, Tricone Bit, DTH Button Bit), Water Well Drill Pipe, Drilling Rig Spare Parts (drilling rods, drilling rods joint, casing pipe, casing coupling, core tube, core tube coupling, lifters, automatic drop hammer, sampler, SPT tool, wrench fork, pad fork, lock joint), Track Transporter.
Main Products: Pneumatic Drilling Rig / Air Drilling Rig (ST-180, ST-200, ST-260, ST-300, ST-350, ST-400, ST-450, ST-500, ST-600, ST-800), Crawler Water Well Drilling Rig / Trailer Mounted Drilling Rig / Water Well Drilling Rig / Hydraulic Borewell Machine / Hard Rock Drilling Equipment / Diamond Core Drill Rig / Geological Drilling Rig / Soil Testing Drilling Rig / Portable Water Well Drilling Rig (ST-30, ST-50, XY-1A, XY-1B, XY-2, XY-2B, GK180, GK200, GY150, GY200), 30 impact drill rig, ZLJ series tunnel drilling rig, Crawler Track Undercarriage, Drilling Mud Pump (BW150, BW160, BW200, BW250, BW850 series), Drilling Air Compressor, Water Well Drill Bits (PDC Drill Bit, Tricone Bit, DTH Button Bit), Water Well Drill Pipe, Drilling Rig Spare Parts (drilling rods, drilling rods joint, casing pipe, casing coupling, core tube, core tube coupling, lifters, automatic drop hammer, sampler, SPT tool, wrench fork, pad fork, lock joint), Track Transporter.
Similar Products
Related Videos
Get in Touch
Have questions about our products or want to discuss a custom order? Our team is ready to help you.
Company
Jinzhou Shitan Machinery Equipment Co., Ltd.
Location
Xiaoshang Village, Yingli Town,Jinzhou City, Hebei Province, China
Contact Person
Anna