Industrial Glove Making Equipment CNC Controlled Gloves Production Machine
Price:
Negotiable
MOQ:
1 set
Delivery Time:
40-60 work days
Brand:
Zhihui
Product Description
Automatic Industrial Glove Making Equipment CNC Controlled
ZHIHUI A.I. Automatic Gloves Dipping Machine is a fully integrated production line designed for the manufacturing of nitrile/latex/PU/PVC/Sandy/Micro Foam coated gloves. Equipped with DELTA PLC automation, 304 stainless steel dipping tanks, auto-feeding with level sensors, and heavy-duty driving chains, this system delivers precise loading, dipping, drying, stripping and packing with minimal operator intervention.
Technical Specifications
| Parameter | Value |
|---|---|
| Line Dimensions (L*W*H) | 65m * 2.5m * 4.7m (frame only, excl. blower height) |
| Daily Throughput | 20,000-30,000 pairs |
| Cycle Duration | 25-45 seconds |
| Installed Power | 50 kW |
| Power Input | 3*380V + N / 50Hz |
| Compressed Air Supply | 0.5-0.8 MPa |
| Control Architecture | Delta PLC |
| Heating Energy | Natural Gas |
| Heating Medium | Thermal oil (320#) + Blower hot air |
| Crew Required | 3-4 operators per shift |
Seven-Stage Dipping Process
| Stage | Tank | Function |
|---|---|---|
| 1 | Coagulant-1 | Primary coagulant |
| 2 | Compound Dip-1 | First-layer latex/NBR coating |
| 3 | Foam | Foam-layer application |
| 4 | Crinkle | Crinkle texture formation |
| 5 | Coagulant-2 | Secondary coagulant |
| 6 | Compound Dip-2 | Second-layer coating |
| 7 | Sandy | Sandy/grip finish |
Core Differentiators
- 7-Tank Versatility - Produce NBR, latex, foam, crinkle, and sandy gloves on one line
- Dual Heating System - Thermal oil + forced hot air for precise temperature profiling
- Universal Mould Compatibility - Palm, half, and full dip from the same mould set
- PLC Control - Automation with temperature regulation
- End-to-End Formula Room - From raw material milling to viscosity measurement, fully equipped pipelines with DN65 temperature control valves (10 units), cast steel gate valves, elbows, flanges, and insulation materials
After-Sales & Technical Support
| Phase | Coverage |
|---|---|
| Warranty | 12 months from commissioning |
| Remote Diagnostics | Complimentary video-assisted troubleshooting |
| On-Site (Warranty Period) | Spare parts + labor: ZHIHUI covers; travel & accommodation: Buyer covers |
| On-Site (Post-Warranty) | All costs (parts, labor, travel, accommodation): Buyer covers |
| Installation Team | 2 technicians (mechanical + electrical), 30-40 working days |
| Formula Support | Optional expert dispatch |
Similar Products
Related Videos
Get in Touch
Have questions about our products or want to discuss a custom order? Our team is ready to help you.
Company
Shandong Zhihui Machinery Technology Co., Ltd.
Location
Westside of Yaoqian Road, Gaomi Development Zone, Gaomi City, Shandong Province, China
Contact Person
May