China Burners Online Market
                                                                                                           
Verified Supplier
Years
Since
Menu

Double Cylinders Excavator Grapple For Handling Stones / Pipes

Price Negotiable
Price: negotiable
MOQ: 1 set
Delivery Time: normailly 7-20 days (depend on the quantity and place)
Brand: YT
Product Description

Double Cylinders Excavator Grapple For Handling Stones / Pipes

 

 

 

 

Introduction

 

Excavator Stone Grab also called Hydraulic Log Grab, Hydraulic Timber Grab , the advantages are following:


1. Design for stone grab working

2. Greatly improve the efficiency of loading and unloading.

3. Driven by hydraulic double cylinders

4. Great help to save the human resources

5. Ensure using safety

6. Convenient and quick for operation

7. Can rotate back and forth of 360°

 

 

Performance characteristics

 

With elegant outlook, reliable performance and high efficiency
The driving cab designed in accordance with ergonomics and equipped with an air conditioner keeps comfortable to the operator.
Equipped with the fault alert and self-inspect system.
Customized engine and strong dynamical system make it excellent in mechanical action, dual driving, and off-road performances; Two sets of throttle controls are more fuel efficient, energy-saving, eco-friendly, fast, and efficient
High-quality pump make smooth actions.
Top-brands Hydraulic hoses have high pressure bearing and excellent pulse performances. Structural parts are made of the domestic qualified 16Mn steel, and advanced 3D graphics and ultrasonic testing of weld seam quality to ensure the safety of driving and construction.

 

 

Features

 

1, we can design hydraulic driven and mechanical type control according to your working need

2, cylinder piston are protected by steel shroud to avoid of damage

3, oil hose are covered by plastic casing for prevention

4, rotary log grapple can rotate 360 degree

 

 

Advantages

 

1. This electric-hydraulic grab is of simple mechanical structure and easy to use.
2. The water-proof design combined with German hydraulic components offers safe, stable and reliable   operation and low maintenance.
3. It has strong digging strength and high efficiency of loading and unloading.
4. Scrap grab can work stably under any circumstances.
5. The grab has tie-in on the grab and it is easy to connect to the crane. 

 

 

Application

 

Designed specifically for rough applications. Its narrow, two-tine clamp and three-tine frame maximize both clamping and digging forces. It is recommended for heavy-duty demolition work, rock handling, severe land clearing jobs, and other applications that require maximum clamping, prying, and breakout forces.

 

 

We Have the Excavator excavator Grapple Used for Follow Types

 

Brand Modle
KOMATSU PC30 PC40 PC56 PC60 PC75 PC100 PC120 PC130 PC200
PC220 PC240LC PC300 PC350 P360 PC400 PC450 PC600 PC1250
CATERPILLAR 306 307 312 315 320C 320D 323 324 325
328 329 330C 330D 336 345 365 385C 385CL
M313D M316 M322            
DOOSAN MX331 DH55 DH55 DH60 DH70 DH80 DH150 DH215 DH220
DH225 DH258 DH300 DH350 DH370 DH420 DH500 DX60 DH210
HITACHI EX30 EX40 ZX60 EX100 ZX120 ZX200 ZX210 ZX240 ZX250
ZX270 ZX330 ZX360 EX400 ZX450 ZX600 ZX870 UH043 UH052
UH053 UH083              
HYUNDAI R55 R66 R70 R80 R110 R130 R150 R200 R215
R225 R265 R305 R335 R375 R385 R455 R505 R450
KATO HD140 HD250 HD400 HD450 HD550 HD700 HD820 HD850 HD88
HD900 HD1220 HD1250            
KOBELCO SK40 SK55 SK60 SK100 SK120 SK130 SK04-2 SK07 SK130
SK140 SK200 SK210 SK250 SK260 SK330 SK350 SK460 SK480
SK07N2 SK09 SK12 SK14 SK300 SK310 SK400    
MITSUBISHI MS110 MS120 MS180 MS230 MS280        
SAMSUNG H.I. MX8 SE200 SE210 SE280 MX292        
SUMITOMO SH70 SH100 SH120 SH160 SH200 SH260 SH265 SH280 SH300
SH340 LS2650 LS2800 LS3400 LS4300        
LIEBHERR R 916 R926 R934 R944 R984 R9350      
SANY SY65 SY75 SY135 SY205 SY215 SY235 SY330 SY360 SY420
SY460 SY700 SY850 SY2000          
VOLVO EC55 EC60 EC140 EW145 EC210 EC240 EC290 EC360 EC460
EC700                
CASE CX36 CX55 CX75 CX130 CX210 CX240 CX360 CX470 CX800

 

 

Shipment

 

1. With regard to transportation, you can make their own arrangements, we can also help you arrange, in general, we are doing the ex-factory price, but if you ask us to help guests arrange transportation, we are very happy, but are you going to bear the corresponding costs

2. Normally we will finish the production within 7 days, but does not exclude the exception

3. About shipping time, in general, different countries need different length of time,the specific time to forwarder there confirmation

 

 

Product image

 

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company China Burners Online Market

Request A Quote

Please check your email address.
Your message must be at least 20 characters.