Jiangyin Dingbo Technology Co., Ltd
                                                                                                           
Verified Supplier
18 Years
Since 2008
Menu

Durable Steel Shutter Door Roll Forming Machine High Speed

Price Negotiable
Price: Negotiation
MOQ: 1 sets
Delivery Time: 40 days after payment
Brand: Shenghong
Product Description
 
Durable Steel Shutter Door Roll Forming Machine High Speed
 
Product Description

 

 

Drawing for you reference:

 

Parameters:

Material specification Aluminum, galvalume, galvanized and pre-painted galvanized steel.
Thickness 0.3 mm to 0.7mm.
Main motor power 4 kw.
Hydraulic station power 3 kw.
Feeding width Depends on the model of profile.
Yield stress 235Mpa(33KSI) ~ 345Mpa (50KSI).
Roll forming Speed 12 m/minute.
Cutting Tolerance +/-2.5mm(length≤5000mm); +/-3.0mm(5000mm<length≤10000mm).
Manual Uncoiler Max. Capacity: 3000kgs.
Coil inner diameter 508mm.
Voltage As per customer’s request.
Numbers of stands 12 stands/stations/pairs for each roll forming system.
Type of cutting Roll-formed and length-set profile cutting.
Roller Material High grade No.45 forged steel, coated with hard chrome.
Active Shaft Material

High grade No.45 carbon wrought steel,

which can improve the integrated mechanic feature of the shaft.

Electric Elements

PLC control panel, transducer imported from Mitsubishi of Japan.

Other elements are from famous suppliers of China.

Cutter blades Cr12 mould steel with quenched treatment.

 

Working steps:

Uncoiling the sheet --- Infeed guiding --- Roll forming --- Rectifying the straightness ---

 

--- Measure length --- Cutting the panel --- panels to the supporter (option: automatic stacker).

 

After-sale Serive

The seller take responsibility to installation and commissioning of the equipment and free training. After machine arrive the destination, by the request of the buyer , the seller will provide 1 technical engineer to guide installation and training , and the buyer should give the technical person with full cooperated.
Installation period: about 5 days after the complete preparation by the buyer such as the foundation and all necessary accessories.
Training time: 5 days.
Before departure of the engineers from seller, the buyer should pay for installation and commissioning fee 100$/day to the point account of the seller. The two-way ticket,visa, food, hotel , the translator and insurance are all should provide by buyer with full responsibility.
The seller supply technical data (including forming mould drawing, electrical elements drawing and equipment drawing etc.)

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company Jiangyin Dingbo Technology Co., Ltd
Location No. 1, Xingyuan Road, Gu Shan Town, Jiangyin city, Jiangsu Province, China
Contact Person Emma Teng

Request A Quote

Please check your email address.
Your message must be at least 20 characters.