DN300 SS316L Electronic operation 3 Pieces Sanitary Butterfly Valves
DN300 SS316 electronic 3 pieces sanitary stainless steel butterfly valve butt welding connection
Specifications
|
Product Name: |
Electric 3PC butterfly valve |
|
Valve Body Material: |
SS304/316L |
|
Seal Material: |
EPDM (standard) FPM/SILICON/NBR, FDA177.2600 |
|
Max Working Pressure: |
10Bar |
|
Max.Working Temperature: |
120 degree C |
|
Available size: |
DN10-DN300, 1/2"-12" |
|
Available connection: |
Clamp/welding/thread/flange |
|
Available standard: |
3A/DIN/SMS/RJT/ISO/IDF |
|
Operated: |
Manual, Pneumatic, Electric |
|
Control: |
Electronic |
|
Certificate: |
3A/54-02 (1580), PED/97/23/EC, FDA.177.2600, ISO |
|
Application scope: |
Dairy,food, beverage, pharmacy, cosmetic, etc |
|
Packaging Details: |
Bubble pack for each valve. Outside packing is carton or plywood cases. Or as per the request of customers. |
|
Delivery details: |
Usually within 20 days after receiving T/T down payment. |
| Mini Electric actuator | |||||
![]() |
Size | Function | Torque and of/off time | Recommend valve size | |
| Butterfly valve | Ball valve | ||||
| DJ-02 | On/off type,active output |
18N.M-60s (standard) 9N.N-7s (optional) |
≤2.5"-DN65 (18n.m-60s) ≤1.5"-DN40 (9n.m-7s) |
≤1"-DN25 (18n.m-60s) ≤3/4"-DN15 (9n.m-7s) |
|
| On/off type, passive output | |||||
| Intelligent type,4-20mA input/output | |||||
Valve Drawing
Material
The material connected with others: AISI 316L / 1.4404
The material in other parts: AISI 304
Seal ring: EPDM FDA 177.2600
Internal surface finish: Ra ≤ 0.8μm
External surface finish: CNC fine machining
Options
Gasket: NBR / MVQ / FPM
The pneumatic actuator of double-acting
Inductive position sensor
C - TOP control head
Position sensor
Connection type: SMS, RJT, DIN, 3A, ISO, Clamped, welded and threaded etc.
Packaging Details
Bubble pack for each valve.
Outside packing is carton or plywood cases.
Or as per the request of customers.
Delivery details
Usually within 20 days after receiving T/T down payment.
Question 2- How about the warranty of your products?
1 year ,not including quick-wear part.Like O-ring
Question 3- What’s your payment terms?
For big amount:By T/T, 30% deposit and the 70% balance to be paid before ship out from DONJOY factory.
Question 4- How long is your production time?
It depends on the quantity of your order. Usually, it takes 15-35 days after we receive your deposit. While for large order, we can work over time to catch up your shipment.
We are honored to offer you samples. The samples can be send by DHL or other international express you want.
Get in Touch
Have questions about our products or want to discuss a custom order? Our team is ready to help you.





