Zhangjiagang HuaDong Boiler Co., Ltd.
                                                                                                           
Verified Supplier
41 Years
Since 1985
Menu

ASME Standard Natural Circulation Boiler Economizer with High Safety Level for Power Plants

Price Negotiable
Price: $1,500
MOQ: 1
Delivery Time: Negotiable
Brand: HD Boiler
Product Description
ASME Power Plant Boiler Thermal Absorption Exhaust Gas Boiler Economizer
High-efficiency ASME-certified boiler economizer designed for power plant applications, featuring advanced thermal absorption technology to optimize energy recovery from exhaust gases.
Product Overview
Boiler economizers are heat exchange devices with finned tubes that heat liquids, typically water, up to but not exceeding the boiling point. We manufacture three types of economizers to meet various industrial requirements.
  • Bare Tube Economizer: Standard design for basic heat exchange applications
  • H-Finned Tube Economizer: High-efficiency design consisting of H-finned tubes that expand heat exchange area while reducing tube count
  • Spiral Finned Tube Economizer: Advanced design featuring spiral fin tubes to minimize abrasion and extend service life
Key Advantages
  • Expanded heat exchange surface area for improved efficiency
  • Reduced number of tubes required for installation
  • Increased flue gas flow area to minimize flow speed and abrasion
  • Double H-finned tube construction provides superior rigidity for long tube rows
  • Spiral fin design overcomes serious abrasion issues and extends service life
Primary Function
The economizer functions to "economize" or reduce operational costs by recovering waste heat from exhaust gases, enabling compressor shutdowns while maintaining adequate cooling capacity and realizing significant energy savings.
Technical Specifications
Description Boiler Economizer
Material Alloy Steel, Carbon Steel, SA210C, SA213T22
Material Standard ASTM, EN or ISO
Dimension Customized to Application Requirements
Weight Range Minimum: 10 tons, Maximum: 1000 tons
Smelting Process EF + LF + VD
Manufacturing Process Material → Ingot → Hot/Cold-Rolling → Heat Treatment (Normalizing + Tempering) → Inspection → Rough Machining → UT → Second Heat Treatment → Finishing Machining → Final Inspection
UT Standard ASTM A388 or EN10228
Quality Assurance
  • Impact testing and strength calculation reports with applied materials information
  • 100% NDT (non-destructive inspection) of steel plate, tube, and electrode
  • Comprehensive welding inspection including X-ray, γ-ray, and liquid penetrant testing
  • Hydraulic testing to ensure standard working pressure and operational safety
Product Gallery
ASME boiler economizer installation and fabrication Industrial boiler manufacturing facility and company operations ASME certification and quality standards documentation Boiler economizer packaging and shipping preparation Frequently asked questions about ASME boiler economizers Contact information for boiler economizer inquiries

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company Zhangjiagang HuaDong Boiler Co., Ltd.
Location Address: N0.1, Dongli Road, Donglai, Zhangjiagang City, Jiangsu Province, China
Contact Person Sandy Chen

Request A Quote

Please check your email address.
Your message must be at least 20 characters.