Energy Saving Electric Steam Hot Water Boilers For Industry & Power Station
Energy Saving Electric Steam Hot Water Boilers For Industry & Power Station
Product Infomation
- The front drum and both sides of the furnace water-wall tubes form radiant heating surface, the rear drum and the tube nest between the header form convection heating surface.
- Coal economizer is installed at the rear of boiler.
- After some heat of the combustion-generated high temperature fume is absorbed by the hearth, the fume flows to the convection heating surface through burn out chamber and exhausts outside through the chimney via coal economizer, dust collector and draught fan.
- HD DZL series steam and hot-water boiler is the single-cylinder, water-tube assembly, chain grate boiler. Boiler drum is arranged along the center of the boiler longitudinally.
Advantages
- Great assembly level, short installation period and inexpensive installation.
- Compact structure, small installation space, single-floor boiler room, cost-effective infrastructure.
- Sufficient and reasonable heating surface, quick temperature/pressure-rise of boiler, satisfactory productivity and high heating efficiency.
- Electric control cabinet is equipped with complete automatic control and monitor instruments featuring high automation, safety, reliability and simple operation.
- Introduce the air with air distribution chambers of grate. All air distribution
- chambers can adjust the air flow independently and grate can be regulated step-less speed.
- Wide range of applicable coals and full combustion.
Parameter
| Model |
SZL6- 1.25-AII 1.6-AII 2.5-AII |
SZL8- 1.25-AII 1.6-AII 2.5-AII |
SZL10- 1.25-AII 1.6-AII 2.5-AII |
SZL15- 1.25-AII 1.6-AII 2.5-AII |
SZL20- 1.25-AII 1.6-AII 2.5-AII |
SZL25- 1.25-AII 1.6-AII 2.5-AII |
SZL30- 1.25-AII 1.6-AII 2.5-AII |
|
| Rated heating efficiency(MW) | 6 | 8 | 10 | 15 | 20 | 25 | 30 | |
| Rated working pressure(MPa) | 1.25/1.6/2.5 | 1.25/1.6/2.5 | 1.25/1.6/2.5 | 1.25/1.6/2.5 | 1.25/1.6/2.5 | 1.25/1.6/2.5 | 1.25/1.6/2.5 | |
|
Rated steam temperature |
193/2 04/226 |
193/2 04/226 |
193/2 04/226 |
193/2 04/226 |
193/ 204/226 |
193/204/226 | 193/204/226 | |
|
Rated outlet temperature |
60 | 60 | 60 | 60 | 104 | 104 | 104 | |
| Heating area | Boiler(m2) | 156 | 197.4 | 235.6 | 412 | 508 | 510 | 588.6 |
|
Coal econo mizer(m2) |
87.2 | 157 | 174.4 | 413/413/236 | 357 | 496 | 450 | |
|
Air pre heater (m2) |
-/-/181 | 199 | 212 | 210 | ||||
|
Effective area of grate(m2) |
7.8 | 10.1 | 11.8 | 17.3 | 21 | 24.3 | 25.8 | |
| Water volume(m3) | 7.3 | 9.6 | 12.4 | 15.3 | 21.6 | 27 | 27.6 | |
| Design efficiency(%) | 80 | 80 | 80 | 80 | 80 | 80 | 80 | |
| Applicable fuel | Soft Class II | |||||||
|
Maximum size of shipping part(m) |
6.1× 3.1×3.5 |
6.8× 3.4×3.5 |
7.6× 3.4×3.5 |
9.6× 3.4×3.54 |
11× 3.41×3.54 |
8.3× 3.0×3.6 |
8.5×3.6×3.64 | |
| Maximum weight of shipping part(t) | 25 | 29 | 31 | 42 | 50 | 22/28 | 23/29 | |
| Overall size of installation(m) |
9.5× 5.5×6.2 |
9.5× 5.5×6.2 |
9.8× 5.7×6.2 |
10.9 ×5.7×6.7 |
12× 5.8×6.8 |
13.8× 6.0×10.6 |
18×6×10.5 | |
| Draught fan | GY6-1 30kw | GY10-1 45kw | GY10-15 55kw | Y5-47 12D 75kw | GY5-47 12.4D 90kw | GY20-15 110kw | GY35-15 132kw | |
| Blower fan | T4-72 5A 11kw | GG10-1 15kw | GG10-1 15kw | G4-73 9D 30kw | G4-73 9D 30kw | GG20-15 55kw | G40-73 10D 55kw | |
| Speed governor | GL-10P 0.75kw | GL-16P 1.1kw | GL-16P 1.1kw | GL-20P/II 1.5kw | GL-20P/II 1.5kw | GL-30P 2.2kw | GL-40P 3kw | |
Company Introduction
- Area 65000m2 (building area 55000m2)
- Over 300 staff
- Production of 33,000 tons in 2019
- Locates in Dong Lai Industrial Park
- 150km expressway to Shanghai
- 60km state road to Suzhou or Wuxi
- Complete 35 export projects (to US, India, Turkey, etc.) in 2019
- Top 100 Enterprises of Zhangjiagang City
Design and development
Collect all parameters for product design, make design acording to the Supervisory Regulations on Boiler Safety Technology, other laws, rules, regulations and professional standards, and 100% meet the product standards and customers' requirements.
Supervision and confirmation
The quality and technical supervision administration authorizes the inspection agency stationed on site to supervise, inspect and test the process of boiler manufacturing.Accept supervision or confirmation of the third party or Customer's representative over the process of boiler manufacturing.
Get in Touch
Have questions about our products or want to discuss a custom order? Our team is ready to help you.


