Zhangjiagang HuaDong Boiler Co., Ltd.
                                                                                                           
Verified Supplier
41 Years
Since 1985
Menu

Submerged Arc Welding High Pressure Energy Saving Boiler Waterwall Panel and Membrane Water Wall

Price Negotiable
Price: 1500
MOQ: 3
Delivery Time: Negotiable
Product Description
Submerged Arc Welding Heating Element Boiler Waterwall Panels
Waterwall panels are essential furnace wall components in water-tube boilers, constructed from refractory materials and evenly spaced tubes that connect to headers and the main generating bank. These panels serve dual purposes: capturing heat that would otherwise escape to the atmosphere to help heat boiler water, while simultaneously keeping refractory materials relatively cool to prevent spalling.
Submerged Arc Welding Heating Element Boiler Waterwall Panels manufacturing process
Product Advantages
  • Ensures furnace wall leakproofness and reduces combustion chamber air leakage
  • Provides complete water cooling of combustion chamber, preventing coking during supplemental firing
  • Features minimal thermal storage capacity for fast warming and cooling cycles
  • Supports top-mounted installation to reduce boiler framework load
  • Enhances tube heat absorption capacity compared to bare tubes
  • Factory-direct manufacturing improves part integration and reduces installation workload
Product Specifications
Product Name Membrane Water Panel
Material Options Carbon Steel, Alloy, Stainless Steel
Tube Size Range Φ38 - 76 mm (Customizable)
Manufacturing Standards ISO, ASME
Application Boiler Combustion Chamber Installation
Quality Assurance
  • Impact testing and strength calculation reports with material information
  • 100% non-destructive inspection of steel plates, tubes, and electrodes
  • Comprehensive welding seam inspection (X-ray, γ-ray, liquid penetrant testing)
  • Hydraulic pressure testing to ensure standard working pressure and safety compliance
Quality inspection of boiler waterwall panels
Packaging & Shipping
Packaging and shipping of boiler components
  • Specialized frame boxes for oversized cargo (overlength, overwidth, overheight, overweight)
  • Standard containers for regular-sized goods
  • Comprehensive cargo reinforcement after loading
Manufacturer Profile
Zhangjiagang Hua Dong Boiler Co., Ltd., established in 1985, specializes in manufacturing power station boilers, industrial boilers, HRSGs, waste incineration boilers, biomass boilers, and related heating surface components. The company provides integrated services from design and manufacturing to installation and maintenance.
Certified according to International Quality Standards, Hua Dong Boiler maintains complete quality assurance and control systems. All manufacturing processes and products are 100% controlled, ensuring compliance with contract requirements, national regulations, and industry standards through stringent inspection and testing.
Certifications
Company certifications and quality standards
Global Distribution
Global sales and distribution network International boiler projects and installations Worldwide customer base and service locations
Frequently Asked Questions
Q1: How long is the warranty period?
We provide 18 months warranty for all spare parts (excluding fragile parts).
Q2: How can we guarantee quality?
  • Strict compliance with ISO quality and CE system requirements
  • Professional skilled labor with dedicated quality control at each procedure
  • Comprehensive product information available through efficient management systems
Q3: What products do you offer?
CFB Boilers, HRSG Boilers, Boiler Economizers, Boiler Fin Tubes, Boiler Air Preheaters, Boiler Superheaters, Boiler Membrane Walls, Boiler Manifold Headers, and other pressure spare parts.
Q4: What services do you provide?
Before Sales: Product information, market research forecasting, product customization, processing services, and technical consultation.
After Sales:
  • Technical training according to customer requirements
  • Warranty replacement services
  • Maintenance spare parts supply
  • Regular customer follow-up and visits
  • Prompt response to complaints and consultation requests
Delivery Terms: FOB, CFR, CIF, EXW, FCA
Payment Options: T/T, L/C, MoneyGram, Western Union, Cash (USD, CNY)
Languages: English, Chinese
Q5: Are you a factory or trading company? Where are you located?
We are a manufacturing facility located just 130km (2 hours by car) from Shanghai Airport. We provide pickup service from Shanghai for customer visits.

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company Zhangjiagang HuaDong Boiler Co., Ltd.
Location Address: N0.1, Dongli Road, Donglai, Zhangjiagang City, Jiangsu Province, China
Contact Person Sandy Chen

Request A Quote

Please check your email address.
Your message must be at least 20 characters.