Zhangjiagang HuaDong Boiler Co., Ltd.
                                                                                                           
Verified Supplier
41 Years
Since 1985
Menu

ASME Standard Serrated Spiral Boiler Fin Tube with Customized Specifications for Enhanced Heat Transfer

Price Negotiable
Price: 1500
MOQ: 3
Delivery Time: Negotiable
Product Description
SA192 Serrated Spiral Fin Tube Boiler Fin Tube ASME Standard
To enhance heat exchange efficiency, finned tubes extend the surface area by adding fins onto a tube. This manufacturing process significantly improves heat transfer efficiency, making them ideal for various heating applications.
Finned Tube Types
  • Welded finned tubes
  • Extruded finned tubes
  • Welded helical solid finned tubes
  • Welded serrated finned tubes
  • Welded helical serrated finned tubes
SA192 Serrated Spiral Fin Tube product illustration
Product Specifications
Item Range
Base Tube O.D (mm) 25.4 mm ~ 1600 mm
Base Tube Thickness (mm) 2.5 mm ~ 40 mm
Fin Height (mm) 0.5 mm ~ 20.0 mm
Fin Thickness (mm) 0.5 mm ~ 3.0 mm
Fin Pitch (mm) 5 mm ~ 25.4 mm
Material Carbon Steel, Alloy Steel, Stainless Steel
Length 0 < L ≤ 12000 mm
Product Details
Base Pipe: Welded or Seamless
Material: Carbon steel, alloy steel, stainless steel, non-ferrous alloys and nickel alloys
Application: Economizer, Evaporator, Superheater, Air heater and related systems
Packaging & Shipping
Fin tube packaging and shipping methods
• Special cargos (overlength, overwidth, overheight, overweight) use frame boxes for easy handling
• Regular goods shipped in ordinary containers
• Comprehensive reinforcement of all loaded goods
Company Profile
Zhangjiagang Hua Dong Boiler Co., Ltd. facility
Zhangjiagang Hua Dong Boiler Co., Ltd., founded in 1985, specializes in manufacturing power station boilers, industrial boilers, HRSGs, waste incineration boilers, biomass boilers and related heating surface components. We provide integrated services from design and manufacturing to installation and maintenance.
Our Advantages
Manufacturing expertise illustration 38 years industry experience
38 Years Experience: Extensive industry research, development and manufacturing with sufficient production capacity.
Quality Control
Quality control processes
  • Impact test and Strength calculation report with applied materials information
  • 100% NDT (non-destructive inspection) report of steel plate, tube and electrode
  • X-ray, γ-ray and liquid penetrant test inspection report for welding seams
  • Hydraulic test report to ensure standard working pressure and safety
Complete quality assurance and control system certified according to International Quality Standards. We establish quality assurance systems in compliance with national regulations, standards and technical requirements, ensuring 100% process and product quality control.
Additional quality assurance illustration
Certifications
Company certifications and accreditations
Global Sales
Global sales distribution map International shipping network Worldwide customer base
Frequently Asked Questions
Q1: How long is the warranty period?
We provide 18 months warranty for all spare parts (excluding fragile parts).
Q2: How can we guarantee quality?
• All machines comply with ISO quality and CE system requirements
• Each procedure crafted by professional skilled labor with dedicated QC
• Comprehensive product information available in efficient management system
Q3: What can you buy from us?
CFB Boiler, HRSG Boiler, Boiler Economizer, Boiler Fin tube, Boiler Air preheater, Boiler superheater, Boiler membrane wall, Boiler manifold headers and other pressure spare parts.
Q4: What kind of service do you provide?
Before Sales: Product information, market research forecasting, product customization, product processing, consultation services.

After Sales:
• Technical training according to customer requirements
• Replacement under warranty
• Maintenance spare parts supply
• Regular customer callbacks and visits
• Prompt response to complaints and consultations

Delivery Terms: FOB, CFR, CIF, EXW, FCA
Payment Currency: USD, CNY
Payment Type: T/T, L/C, MoneyGram, Western Union, Cash
Languages: English, Chinese
Q5: Are you a factory or trading company, where are you located?
We are a factory located just 130km (2 hours by car) from Shanghai Airport. We offer pickup service at Shanghai for your visit.

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company Zhangjiagang HuaDong Boiler Co., Ltd.
Location Address: N0.1, Dongli Road, Donglai, Zhangjiagang City, Jiangsu Province, China
Contact Person Sandy Chen

Request A Quote

Please check your email address.
Your message must be at least 20 characters.