Zhangjiagang HuaDong Boiler Co., Ltd.
                                                                                                           
Verified Supplier
41 Years
Since 1985
Menu

SA210 Gr.C Carbon Steel Boiler Membrane Wall Panel with φ51×5mm Seamless Tube and High-Frequency Resistance Welding for HRSG Water Wall Section

Price Negotiable
Price: USD 850-1300 / Ton
MOQ: 1 Set
Delivery Time: 30-45 working days
Brand: HD Boiler
Product Description
SA210 Gr.C Carbon Steel Boiler Membrane Wall Panel φ51×5mm Seamless Tube HRSG Water Wall Section
SA210 Gr.C Carbon Steel Boiler Membrane Wall Panel - φ51×5mm for HRSG

The SA210 Gr.C Carbon Steel Boiler Membrane Wall Panel with φ51×5mm seamless tubes is engineered for heat recovery steam generator (HRSG) water wall sections in combined cycle power plants. This heavy-duty panel delivers reliable performance under cyclic thermal loading conditions.

Material & Construction

Fabricated from SA210 Gr.C medium carbon steel seamless boiler tubes, offering higher tensile strength compared to Gr.A1. The tubes are welded to Q245R carbon steel membrane bars using precision high-frequency resistance welding (HFRW), creating a continuous gas-tight membrane structure. SA210 Gr.C provides excellent creep resistance at elevated temperatures up to 450°C.

Key Features
  • Enhanced Strength: SA210 Gr.C material provides superior yield and tensile strength for high-pressure applications
  • HRSG Optimized: Designed to withstand thermal cycling typical of combined cycle plant start-stop operations
  • Leak-Proof Welding: 100% HFRW with automated weld monitoring ensures consistent membrane bond integrity
  • Modular Design: Pre-fabricated panel sections reduce on-site welding and installation time by up to 40%
  • Full Traceability: Each tube is marked and traceable to its original heat number and material test certificate
Quality Assurance

All panels undergo hydrostatic testing, radiographic examination of tube butt welds, and dimensional inspection per ASME Section I requirements. Material certificates per EN 10204 3.1 are provided with each shipment.

Technical Specifications
Parameter Specification
Tube OD φ51mm
Tube Wall Thickness 5mm
Tube Material SA210 Gr.C
Membrane Bar Material Q245R
Tube Pitch 80-100mm
Welding Method High-frequency resistance welding
Standard ASME Section I & VIII, EN 12952
Applications

Specifically designed for HRSG evaporator water wall sections in combined cycle gas turbine (CCGT) plants, cogeneration facilities, and industrial waste heat recovery systems. Custom configurations available for replacement and new-build projects.

Send us your boiler drawings and specifications for a detailed quotation with lead time and shipping options.

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company Zhangjiagang HuaDong Boiler Co., Ltd.
Location Address: N0.1, Dongli Road, Donglai, Zhangjiagang City, Jiangsu Province, China
Contact Person Sandy Chen

Request A Quote

Please check your email address.
Your message must be at least 20 characters.