Zhangjiagang HuaDong Boiler Co., Ltd.
                                                                                                           
Verified Supplier
41 Years
Since 1985
Menu

Steel Power Plant CFB Boiler Steam Drum / High Pressure High Temperature Drum

Price Negotiable
Price: Negotiable
MOQ: 1 set
Delivery Time: 50~100 Days
Brand: HD Boiler
Product Description

 Environmental Power Plant CFB Boiler mechanical Steam Drum High pressure High temperature drum


Description
 
It is the main part of the boiler ,in which steam and water separates. Inside the boiler, saturated steam is separated from water and then directed into super heating tubes for further temperature increase.
Water separated from steam will combine with the incoming boiler feed water and then re-enter the down comers to repeat the cycle. Thus the boiler drum acts as a steam separator.
 
Features
1. Chinese Famous Brand.
2. Premium Quality, Competitive Price.
3. Fast Delivery, Excellent After-sale Service.
4. Certificate ISO9001, ASME, ISO14001, SGS.
5. Compact structure, easy to install.
6. The exhaust gas passes through the force convection tube bundle, improving the efficiency of the boiler.
 
Classification

Pressure Low Middle High Superhigh
Inner diameter(mm)

800-1200

1400-1600

1600-1800

1600-1800
Thickness(mm) 16-25 32-46 60-100 80-100
Material Carbon steel Carbon steel & Alloy steel Carbon steel & Alloy steel Alloy steel
 

 
Working Progress
 
The separated steam is drawn out from the top section of the drum and distributed for process. Further heating of the saturated steam will make superheated steam normally used to drive a steam turbine. Saturated steam is drawn off the top of the drum and re-enters the furnace in through a superheater. The steam and water mixture enters the steam drum through riser tubes, drum internals consisting of demister separate the water droplets from the steam producing dry steam. The saturated water at the bottom of the steam drum flows down through the downcomer pipe. 
 
Sectional drawing
 
 

 
 
Certificate
 

 
Company Introduction

 

Established in 1985,Zhangjiagang Hua Dong Boiler Co.,Ltd.(trading as HD Boiler),produces power plant; industrial; waste heat; waste incineration; biomass; organic heat carrier and electric steam boilers. Coupled with a comprehensive range of heating surfaces, HD Boiler brings to the market a unique service including boiler design , fabrication, installation, maintenance and replacement of boiler pressure parts.

 
1. Fabrication area of 200,000 square meters
2. 150 Engineers
3. 600 Coded welders
4. 60 Licensed Inspectors(NDT Level-III instructors)
5. Class-A Licenses for Design and Manufacture Boiler
6. ISO 9001:2008 Quality System
7. ASME Certificate of Power Boilers
8.ASME 'S','U' and NB stamp authorization
 
Design and Manufacturing capacity
 
1. Two automatic coiler production lines
2. Hot bending to minimum bending radius 0.6D
3. Membrane wall tube bending , with horizontal and vertical panel bending machines
4. Panel fabrication for up to for 1000MW power plant boilers
5. Fabrication of CFB Boiler Cyclone Separators
6. Fabrication of Header to Chinese standards(GB), US standards (ASME), or EU standard (EN)
7. Broad range of heat treatment equipment including 10 furnaces, offering normalizing and tempering
 

 

 

 

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company Zhangjiagang HuaDong Boiler Co., Ltd.
Location Address: N0.1, Dongli Road, Donglai, Zhangjiagang City, Jiangsu Province, China
Contact Person Sandy Chen

Request A Quote

Please check your email address.
Your message must be at least 20 characters.