Zhangjiagang HuaDong Boiler Co., Ltd.
                                                                                                           
Verified Supplier
41 Years
Since 1985
Menu

Carbon / Stainless Steel Boiler Economizer For Power Plant Heat Exchanger

Price Negotiable
Price: Reasonable
MOQ: 500 tons
Delivery Time: 30 working days
Brand: HD Boiler
Product Description

 

 

 

Carbon/Stainless Steel Boiler Economizer For Power Plant Heat Exchanger

 

Product Information

 

Economizer is installed on the lower part of the boiler tail flue for recycling the waste heat of smoke, a device of heating boiler feed water into steam drum pressure of saturated water heating surface, because it absorbs the heat of high temperature flue gas, reducing the exhaust temperature of flue gas, save the energy, improve the efficiency, so called economizer tube type economizer pressure without limit, can be used as a boiling type, generally by the outer diameter of 32 ~ 51 mm carbon steel tube in tube with fins and sometimes fin, to improve the effect of heat transfer tube type economizer from horizontal arrangement of parallel bend pipe.

 

 

Procedure

 

Economisers also reduce the potential of thermal shock and strong water temperature fluctuations as the feed water enters the drum or waterwalls. Increasingly stringent environmental regulations limiting nitrogen oxides and sulfur dioxide emission can also affect economizer design. The gas-side heat transfer coefficient is much less than water side heat transfer coefficient. To compensate this, outer surface of the tubes may be finned to increase the surface area of heat transfer. The ultimate goal of economizer design is to achieve the necessary heat transfer at minimum cost. A key design criterion for economizer is maximum allowable flue gas velocity. Higher velocity provide better heat transfer and reduce capital cost.

 

 

Specifications

 

Name(unit) Specification(mm)
Bare pipe(OD) 25-1650
Bare pipe(Thickness) 2-40
Fin (Thickness) 0.6-3.0
Fin (Height) 5-30
Fin tube thread pitch 5-30
Fin tube length ≤12000

Material:Carbon Steel,Alloy,Austenitic Steel(Nickel and Chromium or Manganese)

 

 

Quality Control

 

1. Impact test and Strength calculation report with applied materials information.

2. 100%NDT(non-destructive inspection) report of steel plate, tube and electrode.

3. X-ray, γ-ray and liquid penetrant test inspection report (welding seam): to ensure the quality of the entire boiler.

4. Hydraulic test report: ensure the standard working pressure and safety.

 

Certificate

 

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company Zhangjiagang HuaDong Boiler Co., Ltd.
Location Address: N0.1, Dongli Road, Donglai, Zhangjiagang City, Jiangsu Province, China
Contact Person Sandy Chen

Request A Quote

Please check your email address.
Your message must be at least 20 characters.