Zhangjiagang HuaDong Boiler Co., Ltd.
                                                                                                           
Verified Supplier
41 Years
Since 1985
Menu
Construction & Real Estate Floor Heating Systems & Parts

Heating Element 98mm Boiler Manifold Headers For Coal Fired Plant

Price Negotiable
Price: Negotiable
MOQ: 1 Set / Sets 10tons
Delivery Time: 50 Days
Brand: HD Boiler
Product Description
 
 
Big volume heating element Boiler Header Manifolds For Coal Fired Plant
 
Product Description

Advanced and reasonable design

WNS series steam boiler adopts the most sophisticated three returns all wet back structure,thread smoke tube structure weld joint with high quality.

A large combustion chamber which increases the radistion heating furnace

Reasonable boiler combustor design, suitable for different fuels such as diesel, natural gas, town gas and mazout, the fuels can burn completely and increasing the radiation heating furnace area,reducing the NOX emissions.

High thermal efficiency

100% corrugated furnace and spirally corrugated tube, can absorb flame heat effectively, thermal efficiency can be more than 96%.

High welding quality

Main boiler welding joint are heat treated to remove the stress ensures the welding quality. Automatic welding facilities guarantee the 100% passing rate of flaw detection.

 

1 Headers form an important part of all types of boilers.
2 Steam from the generating tubes is collected in headers which are therefore always under pressure.
3 This pressure may vary from 300 psi to 2000 psi. Since headers are always under pressure, the utmost care is taken by us while fabricating them.
4 Depending on the generating capacity of the boiler the header sizes fabricated by us vary from 100 mm to 600 mm NB. The stubs of various sizes are very carefully welded to the main body of the header to provide the desired openings from the header.

 

1 In manufacturing, the key of end cover hinder is welding.
2 Since by manual arc welding, the weld joint is single-side welding without quality guarantee at the ends.
3 In addition, due to large welding workload, frequent return for repair and long working period, it became the throat process of the whole hinder production.
4 When making hinders of the style, we adopt advanced production technique, complete large equipment and mature technology, especially automatic submerged arc welding between hinders and end covers.

 

Details


1 The necking hinders of the Company are made by hot press and retracting of seamless steel pipes at special hinder necking machine.
2 In this way, the hinders will have thicker walls and cleaner surface. The necking cover will form membrane stress rather than bending stress with desired stress performance under the effect of inner pressure.

 

Features


1 Strength calculation report with applied materials information.
2 100%NDT(non-destructive inspection) report of steel plate, tube and welding rod.
3 100%X-ray inspection report (welding seam): to ensure the quality of the entire boiler.
4 Hydraulic test report: ensure the standard working pressure and safety.
5 Excellent in welding quality, highly automatic, safe and reliable.

 

 

Classification


 

Material Carbon steel,Alloy steel,Stainless steel.
Length According to costumes requirements.
Temperature Range 300℃~1500℃
Diameter(OD) 76mm~914mm

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company Zhangjiagang HuaDong Boiler Co., Ltd.
Location Address: N0.1, Dongli Road, Donglai, Zhangjiagang City, Jiangsu Province, China
Contact Person Sandy Chen

Request A Quote

Please check your email address.
Your message must be at least 20 characters.