Zhangjiagang HuaDong Boiler Co., Ltd.
                                                                                                           
Verified Supplier
41 Years
Since 1985
Menu

ASME SA210M-A1 Weighing 25 Tons Boiler Economizer For Power Plant

Price Negotiable
Price: Negotiable
MOQ: 5 tons
Delivery Time: 40 Days
Brand: HD Boiler
Product Description

 

 

ASME Standard Boiler Economizer Made of SA210M-A1 total weighing 25 tons

 

Description

 

Boiler economizer is kind of heat exchanger to heat the feed water using the flue gas heat. The flue gas coming from the tube outside is up and down cross-flow scrubbing the tube bundle, passing the heat to the tube wall. The water is flowing from bottom to top, and absorts the heat from the tube wall, and its temperature is getting high. This way not only can countercurrent heat transfer to save metal consumption, but also is good for water/steam to flow and exhaust as well as decreasing corrusion. One more, this way works well for dust cleaning.

 

 

Functions

The origin to use economizers is to heat the feed water using flue gas waster heat so as to decrease the exhaust temperature and increase boiler efficiency, save fuel consumption, which is how economizer is named. If use boiler economizers, the feed water is already heated here before coming to evaporation heating surface, thus the heat absorted on evaporation heating surface as well as the heating area is definitely decreased. Boiler economizers are countercurrent placed. The working fluid average temperature is lower than that of surnatured water, and apply mandatory flow to create conditions for application of thin wall and small diameter tubes. The whole structure is also very tight. Thus, the heat transfer temperature difference and heat transfer co-efficient is higher than that of convection evaporation tube bundle who has the same smoke temperature range. That boiler economizers to replace convection evaporation tube bundles can decrease metal consumption by a large extend. Further more, the heated feed water comes to steam drum, this way can decrease the temperature difference between the water and the steam drum wall, and ultimately decrease the thermal stress of the steam drum. Due to reasons above, now economizer are the crutial parts of boilers.

 

 

Specifications

 
Description Boiler economizer
Material Alloy steel, Carbon steel, SA210C ,SA213T22, etc.
Material standard ASTM, EN or ISO etc.
Dimension Customization
Weight

Min: 10 ton

Max.:1000 ton

Smelting Process: EF+LF + VD
Process Material→Ingot → Hot/Cold-Rolling→ Heat treatment (Normalizing+ tempering) → Inspection →rough machining→UT →2nd Heat treatment →finishing machining →Inspection
UT standard ASTM A388 or EN10228, etc

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company Zhangjiagang HuaDong Boiler Co., Ltd.
Location Address: N0.1, Dongli Road, Donglai, Zhangjiagang City, Jiangsu Province, China
Contact Person Sandy Chen

Request A Quote

Please check your email address.
Your message must be at least 20 characters.