Cangzhou Zhaoli Import & Export Trade CO.,LTD.
                                                                                                           
Verified Supplier
13 Years
Since 2013
Menu
Machinery Packaging Machine Packaging Forming Machines

Change Order One Minutes Automatic Stitching Machine For Corrugated Boxes

Price Negotiable
Price: Negotiable
MOQ: 1 set
Delivery Time: 30 days after receive deposit
Brand: ZHAOLI
Product Description

Semi-automatic Slotting Corrugated Carton Box Stitching Machine

 

Machine features: 

1 One minute quick order change.The whole machine adopt full electrical control,easy to operate, no training.
2 Single, double, supplement stitching are available.
3 Stitching pitch is 20-160mm, automatic caculate stitching pitch; servo motor from Taiwan to control stitching pitch.
4 Touch screen adopt Taiwan Eview brand, 5.7 inch high definition colorful display touch screen.
5 The latter department automatic counter, can design as 1-99, easy to binding.
6 Head and fork material main is exported alloy steel, made through special heat treatment process.
7 The max unfolded single sheet width is 4m, min is 1m.
8 Stitching whatever the carton have cover or not, the first stitch pitch is 20mm.
9 Adopt Germany timing belt to send the paperboard, can avoid the price scissors. Adjust feeding paperboard timing belt electrically, adjust head size electriclly to fasten change order speed.
10 Working table up and down automaticlly.

 

Technology: 

max working size  (length+width)x2 2460mm
min working size (length+width)x2 606mm
max working size (width+height)x2 1515mm
min working size (width+height)x2 300mm
height of table  900mm
speed  400nails/min
power 4kw
machine size  2.8x2.6x1.7m
machine weight  2000kg
stitching pitch 30-100mm

 

Package: 

The normal package is plastic film(Size: L*W*H). If export to european countries,the wooden box will be fumigated.If container is too tigher,we will use pe film for packing or pack it according to customers special request.

 

pictures:

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company Cangzhou Zhaoli Import & Export Trade CO.,LTD.
Location Yonghuixintiandi, West of Dongxing Road , Dongguang County , Cangzhou City , Hebei Province , China
Contact Person Dara

Request A Quote

Please check your email address.
Your message must be at least 20 characters.