Henan Dowell Crane Co., Ltd.
                                                                                                           
Verified Supplier
71 Years
Since 1955
Menu

Launcher Mobile Girder Crane Construction Beam High Efficiency ISO CE Certification

Price Negotiable
MOQ: 1 Set
Delivery Time: 60days
Brand: Dowellcrane
Product Description

160T Concrete Metro Bridge Construction Beam Launcher Girder Crane

 

Product Description

 

160T Concrete Metro Bridge Construction Beam Launcher Girder Crane is a device that puts the prefabricated beam on the prefabricated pier. The bridge crane belongs to the crane category, because its main function is to lift the beam piece, and then transport it to the position and then lower it. But it is very different from cranes in general. The requirements are harsh, and there is walking on the beam, or it is called vertical displacement.

 

 

Installation Site

 

 

Disassembly and maintenance

 

1. When disassembling the girder beam, support it with a sleeper stack. The sleeper stack must be firm and reliable. High-strength bolts dismantled after being heated by flames must be scrapped and not allowed to be inherited.
2. Workers entering the demolition site must wear safety helmets and protective shoes. Staff who do homework above the girder beam must wear safety belts. This is the most basic safety protection for operating bridge installation equipment.
3. The electrician should mark all cables and wires before dismantling, and the dismantling site should be blocked, and irrelevant employees are strictly prohibited from entering.
4. In case of temporarily dismantled bolts, dismantle after applying diesel infiltration. Do not dismantle by forcing a blow or heating with flame.
5. After the bridge frame beam is completed, the track should be laid, the bridge crane should be driven to the bridge head, and the disassembly work should be performed. The crew should identify the hydraulic fittings, oil cylinders and other components that need to be marked to facilitate disassembly and next assembly.
6. The dismantling work is organized and directed by the person in charge of the bridge and the technical staff, and it is performed in the reverse order of assembly.
7. The removed parts should be maintained and classified, and the interface of the hydraulic pipe fittings should be sealed.

 

Parts Of Crane

 

 

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company Henan Dowell Crane Co., Ltd.
Location Economic Development Area, XinXiang city, Henan province, China.
Contact Person June Chao

Request A Quote

Please check your email address.
Your message must be at least 20 characters.