Customized Hub Motor Test System For Electric Vehicle And Electric Bicycles

Price Negotiable
Price: 1st Tier: 1 Set, Unit Price USD 3.00 2nd Tier: 2-5 Sets, Unit Price USD 2.00 3rd Tier: Over 5 Sets, Unit Price USD 1.00
MOQ: 1
Delivery Time: 8-12 weeks
Brand: SEELONG
Product Description

Customized Hub Motor Test System for Electric Vehicle and Electric Bicycles

 

 

Introduction:

 

New energy vehicles use hub motors as drive units, and electric bicycles and electric motorcycles in the market use hub motors as drive units. The product performance and quality must be ensured during product development and factory inspection of hub motors. Therefore, the performance of the hub motors is strictly enforced. The testing and analysis of this is particularly important. This system is based on the national standard GB/T 18488.1-2015 "Electric Vehicle Motors and Controllers Part One Technical Conditions", GB/T 18488.2-2015 "Electric Vehicle Motors and Controllers Part Two Test Methods" and refer to other national standard requirements.

 

 

Guideline:

 

●GB/T 50055-93 "General Electric Equipment Power Distribution Design Code"

 

●Mechanical manufacturing system according to GB9061-85

 

●The electrical system is in accordance with GB5226-85

 

●GB/T 18488.1-2015 "Electric Vehicle Motors and Controllers Part One Technical Conditions"

 

●GB/T 18488.2-2015 "Motors and Controllers for Electric Vehicles Part II Test Methods"

 

●GB/T 18385-2005 "Electric Vehicle Power Performance Test Method"

 

●GB/T 18386-2005 "Electric Vehicle Energy Consumption Rate and Driving Range Test Method"

 

●GB/T 755-2008 "Rating and Performance Test Method for Rotating Electrical Machines"

 

●GB/T 29307-2012 "Reliability Test Method of Drive Motor System for Electric Vehicles"

 

●GB/T 22669-2008 "Three-phase permanent magnet synchronous motor test method"

 

●GB/T 1032-2005 "Three-phase asynchronous motor test method"

 

●GB/T 50054-95 "Code for Design of Low-Voltage Power Distribution"

 

 

System composition

 

The in-wheel motor test system adopts a modular and integrated design. The operation part is ergonomically designed and can complete manual/automatic mode control. It is composed of three parts: mechanical system, electrical system, and system software.

 

●Mechanical system: Integral platform + test stand and other equipment.

 

●Electrical system: two-way DC power supply, drive controller, hub motor, sensors (torque, speed, voltage, current) real-time data acquisition system, data acquisition, alarm system and other equipment.

 

●System software: The upper computer test software is divided into data acquisition communication module, data acquisition setting module, data real-time exchange control module, and data processing module according to the system. The upper computer completes the functions of test control, data analysis and display, data recording and export according to the test items.

 

 

Characteristic curve

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company Seelong Intelligent Technology(Luoyang)Co.,Ltd
Location NO 18 YANGUANG ROAD HIGH TECH DEVELOPMENT ZONE, LUOYANG AREA OF CHINA (HENAN) PILOT FREE TRADE ZONE
Contact Person Vicky Qi

Request A Quote

Please check your email address.
Your message must be at least 20 characters.