Guangzhou Kafu Engineering Machinery Parts Co., Ltd.
                                                                                                           
Verified Supplier
18 Years
Since 2008
Menu

Iron Excavator Fuel Tank 3 Months Warranty For Manufacturing Plant

Price Negotiable
Price: $6.90/Pieces >=1 Pieces
MOQ: 1
Delivery Time: 2-8 DAY
Brand: KFMC
Product Description
Condition:
New, Ready
Applicable Industries:
Building Material Shops, Machinery Repair Shops, Construction works , Energy & Mining
After Warranty Service:
Video technical support, Online support
Local Service Location:
None
Showroom Location:
None
Video outgoing-inspection:
Not Available
Machinery Test Report:
Not Available
Marketing Type:
Ordinary Product
Place of Origin:
Guangdong, China
Brand Name:
HERUI
Warranty:
6 months
After-sales Service Provided:
Video technical support, Online support
Application:
Excavator Spare Parts
Part name:
Air Pressure Sensor
Model:
PC200-8
Delivery:
Received Payment
MOQ:
1pcs
Supply Ability
Supply Ability
200 Unit/Units per Month
Packaging & Delivery
Packaging Details
Standard export packing:
1.Neutral packing with clean box or carton
2.Original packing
3.As per customer's requirement
Port
 
Huangpu Port
100% quality assurance, develop and manufacture follow original ones;
Reasonable stock and timely delivery;
Quick response within 24 hours ;
Long-term strong and steady supplying ability;
One-to-one products factory.Ensure the best quality;
The first-class logistics & Ensure that your goods arrived safely;
Goods will Be packed safe & carefully;
Excellent After-sales service.Track usage.Positive feedback response;
Establish inquiry library for you, we are your professional sourcing consultant.
Q: What is your main market? South America, South Africa, South Asia, Mid East, Southeast Asia, Eastern Asia, Central America Oceania, Africa and so on.
Q: What is your main categories? Hino truck parts, mitsubishi truck parts, isuzu truck parts, nissan truck parts.
Q: What is the delivery time for my order? What is the MOQ order for your goods? Usually, the goods would be shipped within 5 days when they are in stock and the goods out of stock would cost about 30 days to produce. There is no MOQ when the goods are in stock.but when they are not, the MOQ order depond different goods.
Q: Why choose us? We are'one-stop-source' supplier, you can get all spare parts from our company Excellent service, fast responded within one working day.0EM orders and process with customer 's sample and technical drawings High quality with reasonable price.
Q: What do we do if we want to start production? First, We should comfirm the goods you need. Then we will send you an invoice with bankinginformation for 30% deposit. When We complete the production,I will let you know and take some pictures to inspect them (or you can come to our factory to inspect them by yourself) . Before the shipment, you need to pay the balance.

The competitive advantage of product line:

Strict quality control, Products can be customized according to customer requirements.

Production Capacity:

Product Line Name Production Line Capacity Actual Units Produced(Previous Year)
Relief Valve; Joystick/Foot Pedal; Hydraulic Spare Parts Relief Valve; Joystick/Foot Pedal; Hydraulic Spare Parts 20,000 Pcs Per Month confidential

Export Market Distribution:

Market Revenue(Previous Year) Total Revenue (%)
North America confidential 5.0
South America confidential 5.0
Eastern Europe confidential 5.0
Southeast Asia confidential 25.0
Africa confidential 5.0
Oceania confidential 5.0
Mid East confidential 5.0
Eastern Asia confidential 5.0
Western Europe confidential 5.0
Central America confidential 5.0
Northern Europe confidential 10.0
Southern Europe confidential 5.0
South Asia confidential 5.0
Domestic Market confidential 10.0

Production Machinery:

Machine Name Brand & Model No. Quantity Number of Year(s) Used Condition
CNC lathe Confidential 24 3.0 Acceptable
Drilling machine Confidential 6 3.0 Acceptable
Grinding machine Confidential 3 3.0 Acceptable
Cleaning machine Confidential 2 3.0 Acceptable

Testing Machinery:

Machine Name Brand & Model No. Quantity Number of Year(s) Used Condition
Press testing machine Confidential 2 3.0 Acceptable

Production Flow:

  • CNC machining
    CNC machining
  • Drilling
    Drilling
  • Grinding
    Grinding
  • Cleaning
    Cleaning
  • Assembling
    Assembling
  • Testing
    Testing

Real Case for Lower MOQ:

Products Name MOQ(in the last 12month)
Relief Valve; Joystick/Foot Pedal; Hydraulic Spare Parts confidential

Real Case for Large Contract:

Products Name Order(in the last 12month)
Relief Valve; Joystick/Foot Pedal; Hydraulic Spare Parts confidential

Short Lead Time:

Products Name Order(in the last 12month) Shortest Lead Time
Relief Valve; Joystick/Foot Pedal; Hydraulic Spare Parts confidential confidential

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company Guangzhou Kafu Engineering Machinery Parts Co., Ltd.
Location CN , Guangdong , Guangzhou , Shop 221, Building 1, No. 36, Zhuji Road, Tianhe District
Contact Person layla

Request A Quote

Please check your email address.
Your message must be at least 20 characters.