Jiangsu Weiying Machine Co. Ltd.
                                                                                                           
Verified Supplier
24 Years
Since 2002
Menu

Fabricating Machinery Idle Spur Gear Transmission Rough Turning State ZF7B

Price Negotiable
Price: CNY+100-400+YUAN
MOQ: 5000
Delivery Time: 5-8 workdays
Brand: WINNER
Product Description

The Idling gear fabricating machinery is CNC Lathe and tooth width of 24.3, The hardness of the product is required to be ≤230HB, there are many hardness classification, among them, brinell hardness is determined by the depth of indentation plastic deformation hardness index.

 

The indenter of rockwell hardness tester C scale is a diamond cone with an apex Angle of 120 degrees. The test load is a definite value, and the Chinese standard is 150 kg force.

 

The indenter of Brinell hardness tester is hardened steel ball (HBS) or hard alloy ball (HBW). The test load varies with ball diameter from 3000 to 31.25 kg force.

 

Rockwell hardness indentation is very small, the measurement value is local, the decimal point must be measured to average, applicable to finished products and thin sections, belonging to a class of nondestructive testing.

 

Product specification:

number of teeth 16
tooth depth 5.34
tooth width 24.3
weight 4.66(rough turning state)
material ZF7B
gear surface hardness ≤230HB
application AT transmission components
product description: for power transmission purposes and parking.
materials transmission structural steel
processing technic 锻造+机加工
forging+machine work
fabricating machinery mechanical press+CNC Lathe+machining center
checkout equipment Klingberg Gear Btesting Center+Zeiss CMM+Mitoyo contourgraph

Related products:

automatic transmission components
auto transmission parts
idle gear
transmission gear
idler gear
spur gear transmission
transmission gear parts
straight gear transmission
output shaft gear
gear forging process
gear tooth width
alloy steel gear
gear drive engine

 

FAQ:

Q:What are your terms of payment?

A:generally speaking, telegraphic transfer 30% serves as deposit, 70% is before deliver, but specific circumstance, want to seek advice from our business branch, according to different actual situation, differ somewhat.

 

Q:What's your lead time?

A: Generally speaking, the specific delivery time depends on the item and quantity of your order, depending on the situation.

 

Q:Can we produce according to the sample?

A: Yes, we will produce according to customers' samples or technical drawings.

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company Jiangsu Weiying Machine Co. Ltd.
Location Chenbao Industrial Park, Xinghua City, Jiangsu Province
Contact Person Jimmy Li

Request A Quote

Please check your email address.
Your message must be at least 20 characters.