Zhejiang Dopow Technology Co.,Ltd
                                                                                                           
Verified Supplier
17 Years
Since 2009
Menu

Plastic Union Straight Air Hose Quick Connect Fittings VPV Pneumatic Fitting Pipe​

Price Negotiable
Price: Negotiable
MOQ: 1
Delivery Time: 5 working days after receiving the customers' payment
Brand: DOPOW
Product Description

Plastic Union Straight Air Quick Connector Tube VPV Pneumatic Fitting Pipe​

 

Product Feature
1, High Strength, Wear Resistance, Corrosion Resistance, High Density, Not Easy to Burst.
2, The Product is Sturdy and Durable and Has a Long Service Life.
3, Easy Installation and Disassembly, Good Sealing Performance.
4, It Can be Used for The Connection of pipes and The Use of Different Pneumatic Components, and Has a Wide Range of Uses.
5, You Can Easily Insert or Pull out the Trachea Without Any Tools
6, The Clip of Connecting Air Pipe is Made of Strong Plastic Material, Which is Not Easy to Fall off After Connection Adopt Sealing Component, Keep Good Sealing, Not Easy to Leak.
7, Freely Change Pipeline Direction After Installation,Easy to Insert or Pull Trachea Manually Without Tools.
Directions for use!
1, The Tube Fitting is Prohibited Where Spark and Fire Might Be Occurred.
2, Do Not Exceed 145Psi Pressure.
3, Working Temperature: 0-60°c,do Not Use Outside the Service Temperature Range to Prevent Deformation of the Sealing Material and Easy Leakage.
4, Do Not Use in Places with Too Much Dust or Particles
5, Do Not Use Any Medium Other Than Air. the Product is Limited to Air or Vacuum Environment.
6, After Completing the Connection, Please Gently Pull the Tube with Your Hand to Make Sure That It is Completely Connected Without Falling Off.
7, Make Sure That the Cutting Surface of the Pipe is Vertical, There is No Scar on the Outer Circumference of the Pipe and the Pipe is Not Oval.
8, Never Apply Tube Joint with Additional External Load(bending,twist or Pulling),otherwise Damage or Leakage Will Be Occurred.
9, When Inserting the Pipe, It Must Be Inserted into the Bottom of the Joint. Failure to Insert the Pipe into the Bottom May Lead to Air Leakage. 

 

 

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company Zhejiang Dopow Technology Co.,Ltd
Location No.138 Ningkang West Road, Yuecheng, Yueqing,Zhejiang,325600,China
Contact Person Ye

Request A Quote

Please check your email address.
Your message must be at least 20 characters.