Shenzhen Fuchangwei Technology Co., Ltd
                                                                                                           
Verified Supplier
15 Years
Since 2011
Menu

22A 0.10uH Smd Shielded Power Inductor Chip For DC Power Lines

Price Negotiable
Price: factory directly
MOQ: 3000 pcs
Delivery Time: 3-21days
Brand: Forewell
Product Description

 

Electronic Components Integrated Circuit Ic Chip Inductor Power Inductor 0.10uH~10uH 22A~2A

 

Features:

  • Magnetically shielded construction, low DC resistance;
  • The use of magnetic iron powder ensure capability for large current;
  • Lowest DCR/uh in this package size
  • Ideal for DC-DC converter applications in hand held personal computer and etc;
  • Handles high transient current spikes without saturation.
  • RoHS compliant

Applications:

  • Smart phone,MID;Communications
  • Next-generation mobile devices with multifunction such as adding color TV and digital movie cameras;
  • Personal navigation systems
  • Notebooks, desktop computers, servers, graphic cards;
  • Portable gaming devices, personal navigation systems, personal multimedia devices;
  • Automotive systems;
  • Telecomm base stations.

Specification:

 

tem Description
Category SMD Molding Power Inductor
Inductance 10uH~10uH
Current Rating (Amps) 122A~2A
Size / Dimension 4.4*4.2*2.0mm
Material one-piece alloy powder

 

 

Dimensions

Specification

Packaging Information

NOTES:

  • DC current (Idc) that will cause an approximate △T of 40℃
  • DC current (Isat) that will cause Lo to drop approximately 20%
  • All test data is referenced to 25℃ ambient
  • Operating Temperature Range -55℃ to +150℃
  • The part temperature (ambient + temp rise) should not exceed 150℃ under the worst operating conditions. 
  • Circuit design, component placement, PWB trace size and thickness, airflow and other cooling provisions                                         
  • all affect the part temperature. Part temperature should be verified in the end application.

Packaging Quantity(pcs)

 

3000/REEL

 

FAQ:

How long will the delivery time take?

Usually takes 14-21 days.

What shipping method will you use?

We can go by ship and UPS, DHL, etc., according to customer requirements

How do you ship the goods and how long does it take to arrive?

We usually ship by LCL or FCL by sea or air.

 

 

 

3000

 

 

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company Shenzhen Fuchangwei Technology Co., Ltd
Location 5th Floor, Building D4, Huitong Industrial Park, Hongye Middle Road, Yongtou Community, Chang'an Town, Dongguan,Guandong,China.
Contact Person Connie Zheng

Request A Quote

Please check your email address.
Your message must be at least 20 characters.