Fullymax Battery Co., Ltd.
                                                                                                           
Verified Supplier
25 Years
Since 2001
Menu

Aero Electric Aircraft Battery Pack Mannned Aircraft Lipo Battery Fullymax Battery

Price Negotiable
Price: To be negotiated
MOQ: 10pcs
Delivery Time: 3~7 working days for small order, 14~21 working days with cells in stock for mass order, 4~6 weeks for cells out of stock
Brand: FULLYMAX
Product Description

Mannned Aircraft lipo Battery

We have polymer lithium high-rate 15c-120c battery pack/ cells, capacity from 350mAh to 25000mAh, most reliable safety and longest cycle life lithium battery.
We also produce many high rate models of Li-polymer battery cells, such as 3C, 5C, 10C, 15C, 20C, 25C, 30C, 35C, 40C, 50C, capacity from 40mAh to 6000mAh. We can make different battery packs with 7.4V, 11.1V, 14.8V, 18.5V, 22.2V, etc. For RC applications and other products.
 

Standard Feature:

  • Max 5C Fast charge

  • Wider operating temperature range -40℃~60℃ outdoors supported

  • Long cycle life,up to 500+ cycles

  • A variety of chemical formulas like LCO/NCM/LFP available

  • Professional and experienced technical team for independent R&D, flexible and reliable technical service customization.

 

Partial Product Models:


 

Partial Product Models​:

Model No.Max cont. dischargeWeightDimensions
FBC8057196 11500mAh 3.6V (NCM)2C196g8.0x57.5x196.5mm
FBC7263110 6000mAh 3.7V (LCO)1C106g7.2x63x110mm
FBC526888 2000mAh 3.2V (LIFE)70C55g4.9x68x88mm
FBC100108100 8000mAh 3.2V (LIFE)40C208g11.0x108x100mm

 

Application​​:

Widely used in Quadcopter/Multicopter Drones/Fixed Wing UAV drone in fields of agricultural spraying, cargo delivery, military, police, surveying and mapping,engineering & construction,mining,environmental monitoring, aerial photography, electric aircraft (eVTOL),etc.
 
 

Manufacturing Capability 

 

 
Capacity&Leadtime
 
   ●  Stacking/per day:50Kpcs
 
   ● Winding/per day:2,00Kpcs
 
  

 
 
● Regular Model:≤8 weeks
 
● Customized:16-18 weeks(The first order, if nonew facility added )
 

 
 

The new plant will be located in the Dongjiang Bay Industrial Park, which will be a national high-end industrial park special for new energy, new information technology and intelligent equipment fields based on the “3+7” industrial park planning and deployment proposed by Huizhou relying on the Greater Bay Area, aiming to integrate Huizhou’s “1+4” industrial parks. The area of the new plant is estimated to be 30,000 square meters. With new high-end equipment and workshop environment, the goal is to build a high-end production line dedicated to high-end customers.

 
 

Quality Management System
Management Improvement according to international standards

ISO9001
Quality Management System

ISO14001
Environmental Management System

Occupational Health And
Safety Management System

Hazardous Substance Process
Management System

Aeroepace Quality Systems
AS9100D:2016

 
 

Safety and environmental Certificates capability&service

  • Simulation tests of safety certificates proceeded
  • Service of certificates application for customers

       
 

Performance Test Capability

 

  • Electric Performance Test
  • Safety Performance Test
  • Mechanical Performance Test
  • Environmental Performance Test
  • Storing Performance Test
     

 
 
 

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company Fullymax Battery Co., Ltd.
Location Building 02&03, Dongjiang Industrial Park, Shuikou Town,Huicheng District, Huizhou, Guangdong, China
Contact Person sales

Request A Quote

Please check your email address.
Your message must be at least 20 characters.