Chanchiyo Holdings Group
                                                                                                           
Verified Supplier
45 Years
Since 1981
Menu

Operating Weight 2500kg Front End Wheel Loader Air Brake Articulated

Price Negotiable
Price: $4000-6000/ Unit
MOQ: 1 Unit
Delivery Time: 5-8 days
Brand: MCLLROY
Product Description

Operating Weight 2500kg Front End Wheel Loader, Air Brake Articulated

 

1. Products Description of MCLLROY Wheel Loader

In general, for construction machinery, the four most important factors are: price, quality, operation, and after-sales.

 

The amount of shovel material and the stability of the loader depend on the cooperation of the loader frame.

The flexibility and light operation mainly depends on the hydraulic system of the loader.

The low failure rate depends on quality as well as the after-sales service.


MCLLROY wheel Loaders are widely used in the construction, municipal engineering, urban and rural gardens, lime, sand, cement factories, mines and other enterprises and institutions and departments. It is particularity applied to the narrow space for the loading operation of stone,sand and other construction materials.

 

2. Specification of MCLLROY Wheel Loader

MCL946 Metric Units
Engine Model Yunnei 4102 Supercharged
RPM 2400
Rated Power 76 kW
Emissions EU Stage II
Operating Weight 6350 kg
Rated Load 2200-2500 kg

 

3. Details and Advantages of MCLLROY Compact Wheel Loader

1) Using the Yunnei National II engine which has the advantage of high efficiency and durability, making it popular in agricultural and small-scale construction projects.

2) The design of the tiger head base strengthens the dynamic arm to withstand the force.

3) Adjustable air-conditioning.

 

4.Production lines of MCLLROY Wheel Loader

A complete production process mainly includes: material procurement-steel plate cutting-welding-spray painting -drying-assembly-inspection

Assembly:

Our factory arrange seven steps for assembly. There are over a thousand parts in a loader. I will talk about assembly of major components.

 

The second step is connecting engine and gearbox, then the third step must be putting them onto the frame.

Put engine on the frame, connect the priority valve, install radiator and water tank;

Add hydraulic transmission oil to the gearbox (add gear oil for mechanical transmission), install the hydraulic transmission oil radiator and pipeline, install the hydraulic oil radiator (the pipeline does not need to be connected), connect the brake caliper pipeline, brake pipeline, connect main reduction (differential) drive shaft.

There are quite so many pipelines here, this step could use many screws and clamps.

In this step, first of all, we must pay attention to the four feet of the frame where the engine is fixed, they have to be level, otherwise, the force is uneven, and there is a risk of cracking in the engine and gearbox housing; and the connection point of the radiator must be fixed with sealant; and then see if the clamp is tight; whether the screws of the transmission shaft are tightened.

2-3 workers will be in charge of this step.

 

 

 

 

CM Issued

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company Chanchiyo Holdings Group
Location No.812, Nandidong road, Qiaonan street,Panyu district, Guangzhou city, Guangdong,China.
Contact Person Jell Young

Request A Quote

Please check your email address.
Your message must be at least 20 characters.