Heavy Duty Bag Making Machine For HDPE Plastic Biodegradable Ribbon Garbage Bag
Heavy duty HDPE plastic cornstarch biodegradable ribbon through garbage trash bin bag on roll making machine
Characteristics:
This equipment has been improved,designed and manufactured by our company ribbon-through referring to foreign technology and is specially used for making ribbon-through type garbage bags or BOPP,PP,flat bags,etc,of LDPE,HDPE plastic film and othermaterials.
Main Technical Variables
|
Model |
RG-RLD1000 |
RG-RLD1200 |
|
Bag width(mm) |
900 |
1100 |
|
Bag length(mm) |
780 |
780 |
|
Speed (pcs/mm) |
15-40 |
15-40 |
|
Total Power(kw) |
8 |
10 |
|
Normal workding(kw) |
4 |
6 |
|
Machine Weight(kg) |
2500kg |
2800kg |
|
Overall dimensions(mm) |
8300*1700*1950 |
8300*1900*1950 |
RUIGAO MACHINERY FACTORY
Ruian Ruigao Machine Factory is located in the south of Zhejiang, founded in 2001. We are a professional producer of film blowing machines, bag making machines, printing machines and plastic recycling machines.
We have a good team for R&D, design and sale. Our engineers have more ten years of experience in Plastic Industry. We can design the machines according to our clients' requirement.
Our markets are South America, Africa, Middle East, EU and Southeast Asia. More than 98% of our products are exported to overseas markets. Exported to USA, Mexico, Greece, Crotia, Columbia, Dominican Republic, Nigeria, Ethiopia, South Africa, Saudi Arab, Israel Etc.
Our Office
Packing Details : Packing,1set/ wooden carton
Delivery Details : 20 days after order
A: We are factory. We have more 2100 square meter workshop and 23 workers containing the 2installment engineer and 1 electric engineer.
We are Factory, so we have cost advantage than others
Q: How do your company control the machine quality?
A: First we control the raw materials quality.
Second, we control the quality of machine when we are processing.
Third, Our installment engineer will test machine.
A: We accept 30% deposit, balance before shipment. And Irrevocable L/C at sight.
Delivery time is 20 to 30 days. It is according to order quantity.
Q: What is your company after sale service?
A: Our installment engineers are available. Normally it will take about 7 to 10 days for all.
Our guarantee is one year. If there is any spare parts is broken, we can send them freely to you.
>>>>Back to home
Get in Touch
Have questions about our products or want to discuss a custom order? Our team is ready to help you.











