NH1 80A 125A 250A 48V PV DC Solar Fuse For Distribution Box
ServiceConditiononNT1typekfuselink(CE,IEC)
Voltagerating:500/690V
Currentrating:upto1250A
Temperaturerange:-5°Cto+40°C
Heightabovesealevel:≤2000m
Humidity:noexceed50%whiletemperatureis+40°Cnoexceed90%whilemonthaveragetemperaturenoexceed25°C
Minbreakingcurrent:upto120KA
Protectingagainstshort-circuit:typeaR
Protectingagainstmotorshort-circuit:typeaM
Standard:IEC60269,EN60269
Classofpollution:thirdclass
Installatin:Ⅲ
| Type | RatedVoltage(V) | RatedCurrent(A) | Grading Current | PCS/CTN | G.W(KG) | N.W(KG) | MEAS(CM) | |
FUSE LINK | NT00C(NHOOC) | 500-660V | 4A-100A | gG/gL/ aR/aM | 180 | 26 | 25 | 35*25*22.5 | |
NT00(NH00) | 500-660V | 10A-160A | gG/gL/ aR/aM | 100 | 22 | 21 | 43*17*23 | ||
NT0(NH0) | 500-660V | 6A-160A | gG/gL/ aR/aM | 72 | 20 | 19 | 37*37*23 | ||
NT1(NH1) | 500-660V | 32A-250A | gG/gL/ aR/aM | 48 | 23 | 22 | 43*28.5*22 | ||
NT2(NH2) | 500-660V | 80A-400A | gG/gL/ aR/aM | 36 | 27 | 26 | 38*31.5*23.5 | ||
NT3(NH3) | 500-660V | 160A-630A | gG/gL/ aR/aM | 24 | 22 | 21 | 44.5*32*20.5 | ||
NT4(NH4) | 500-660V | 500A-1250A | gG/gL/ aR/aM | ||||||
FUSEHAND | 50 | 18 | 17 | 36.5*34*50.5 | |||||
FUSE BASE | NT00C(NH00C) | 500-660V | 160A | gG/gL/ aR/aM | 108 | 28 | 27 | 38*30.5*29 | |
NT00(NH00) | 500-660V | 160A | gG/gL/ aR/aM | 108 | 28 | 27 | 38*30.5*29 | ||
NT0(NH0) | 500-660V | 160A | gG/gL/ aR/aM | 72 | 30 | 29 | 41*36*25 | ||
NT1(NH1) | 500-660V | 250A | gG/gL/ aR/aM | 30 | 24 | 23 | 41*33.5*29 | ||
NT2(NH2) | 500-660V | 400A | gG/gL/ aR/aM | 20 | 24 | 23 | 46*33*22 | ||
NT3(NH3) | 500-660V | 630A | gG/gL/ aR/aM | 20 | 26 | 25 | 46*26*34 | ||
NT4(NH4) | 500-660V | 1250A | gG/gL/ aR/aM | ||||||
HHouse Service CU
T OUT FUSE 1
1 Where is your factory?
Our factory is located in Qiaoqian Industry Area, Liushi Town, Yueqing City, Zhejiang Province, 325603 China.
2 Are you manufacturer or business?
We are manufacturer established in 2002, and have over 16 years production experience.
3. Can I ask for samples?
Yes
4. What´s the warranty of your products?
18months
5. What´s the lead time?
Depend on the quantity and model of the order, normally it takes around 2-3days, butthe
exact lead time should be discussed with our sales.
6.How about the MOQ, Payment term, Delivery port, and shipping date?
1)MOQ: 100 pcs/item based on existing packing.
2)T/T-30% deposit and 70% against copy of BL
3)L/C is also acceptable
4)Ningbo/Shanghai



Get in Touch
Have questions about our products or want to discuss a custom order? Our team is ready to help you.




