Zhejiang Yomin Electric Co., Ltd
                                                                                                           
Member Supplier
14 Years
Since 2012
Menu
Fuses

Single Phase Sp Cutout Fuse 1p+n 60 / 80a Double Black Bakelite

Price Negotiable
Price: $0.89 - $2.23/Pieces
MOQ: Negotiable
Delivery Time: Negotiable
Brand: YOMIN
Product Description

cut-out fuse 1P+N 60/80A (Double)

 

Specifications

Standard: BS1361 Single phase ( SP) or SPN cut out fuse Black bakelite/Grey resin materials Al or copper conductor

 

+ STANDARD INSULATED CUTOUTS are engineered to provide complete safety & security to

the users and match with the modern aesthetics.

+ They are designed to safe guard distribution, control and protection from shocks &

accidental touch.

+ STANDARD CUTOUTS match the latest technology anywhere in the world.

 

 

STANDARD CUTOUTS are made of high grade phenolic or resin moulding powder having high mechanical and dielectric strength, The body posses non-hygroscopic and non-tracking qualities. Electrolyic Copper with phosphor bronze back up compression springs capable of providing flawless service for years of use

 

Feature

1. All components are inter-locked

2. Sealing provision to avoid unauthorized access

3. Common body from 15 Amps. To 100 Amps

4. Terminals are suitable for Aluminium /Copper conductors upto 35 sq. mm

5. Loop in and Loop out cabling contacts available.

 

 

Classification

 

15 Amps. To 100 Amps. In single pole & neutral and Triple pole neutral configurations.

SPECIFICATIONS

STANDARD INSULATED SERVICE CUTOUTS conform to BS1361-1986 STANDARD SRH FUSES conform to BS:1361-1986

 

Photographs

H cut-out fuse

1P+N 60/80A (Double)

 

1Where is your factory?

Our factory is located in Qiaoqian Industry Area, Liushi Town, Yueqing City, Zhejiang Province, 325603 China.

2 Are you manufacturer or business?

We are manufacturer established in 2002, and have over16years production experience.

3. Can I ask for samples?

Yes

4. What´s the warranty of your products?

18months

5. What´s the lead time?

Depend on the quantity and model of the order, normally it takes around2-3days, buttheexact lead time should be discussed with our sales.

6.How about the MOQ, Payment term, Delivery port, and shipping date?

1)MOQ: 100 pcs/item based on existing packing.

2)T/T-30% deposit and 70% against copy of BL

3)L/C is also acceptable

4)Ningbo/Shanghai

 

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company Zhejiang Yomin Electric Co., Ltd
Location Qiaoqian Village, Liushi Town,Wenzhou,China
Contact Person Linda

Request A Quote

Please check your email address.
Your message must be at least 20 characters.