YUEMI
                                                                                                           
Verified Supplier
24 Years
Since 2002
Menu

CMSB-20mm Lingxiao GD Pipeline Water Pump Mechanical Seal NBR CAR CE

Price Negotiable
Price: US $ 1.6-9.6/PCS
MOQ: 1/PCS
Delivery Time: 2 word days
Brand: YUE MI
Product Description

 


 

Product Description
O-Ring Mechanical Seals
Temperature: -30ºC to 200ºC, dependent on the elastomer
Pressure: Up to 5 bar
Speed: Up to 15 m/s
End play/axial float allowance: ±0.1mm
Size: 10mm to 30mm

Stationary Ring: Plastic Carbon, Carbon, Ceramic

Rotary Ring: Ceramic, Silicon Carbide

Secondary : NBR/EPDM/FKM

 
 

 

SB-1011.027.023.010.57.14.0
SB-1214.032.025.010.28.55.0
SB-1618.041.031.011.89.55.0
SB-16A18.041.035.016.5069.0
SB-1718.535.030.016.07.56.0
SB-2021.045.035.011.011.05.0
SB-2526.452.041.319.011.511.0
SB-3031.058.048.016.512.08.5

Technical Parameters
 
 

Temperature-30℃~+180℃
pressure≤0.8Mp a
Speed≤12m/s
MediumChemical raw materials

 

Materials
 

Rotary RingSIC CAR CE 
Stationary Ring

SIC CAR CE 

SpringSUS304/SUS316
Stationary SeatSUS304/SUS316
Secondary Seal

 Fkm/EPDM

Rotary Ring HolderSUS304/SUS316

 

 

 
Preperation:
1. Shaft Outside Diameter is within tolerance +-0.05mm
2. Shaft run out <0.1mm
3. Shaf end float <0.13mm
4, No sharp edges on the shaft over the o ring
Note:
During the installation,don't scratch or damage the o ring.lf anything is damaged,please contactwith Us to replace a new one.
Installation in strucstions:
1. The full set of cartridge seal is cleaned and exactly passed leakage examine before sale.Inorder to avoid damage,don't disassemble and clean the parts again before fixing.
 
2 The fitting allowance between the seal and shaft is dl h6 0.8,and there should be leading-inedge at the end of shaft.The outside diameter of shaft at the position of screw should be 01 0.2mm smaller,resisting the screw over-tighten.Lubricate the shaft with oil
 
3. Place the cartridge seal into the pump chamber,then:
A: Tighter four screw bolts of flanges,ensuring the medium leading in hole"G"at the top Position
B : Tighter four set screws and position the shaft sleeve on the shaft.
C: Remove four gauge plates.Please keep them and they wil be used in future installation and
disassemble.
D: Connect the medium lead_in pipe with hole"G"in order to flush away the friction heat and
flushing the seal chamber when pump running.
Note:
ter complete the installation,turning the shaft by hand to check for the rotationi he shat could not rotate smoothily,seal had been improperly installed.
 
 
 

We would like lo sincerely ooperale with Clients to supply high qually products and senice We beleve in establishing a long:erm cooperalive relalionshipis lhe key to suceess

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company YUEMI
Location Huadu District, Guangzhou City, Guangdong Province, China
Contact Person ZENG

Request A Quote

Please check your email address.
Your message must be at least 20 characters.