Xcell Energy Equipment (Suzhou) Co., Ltd.
                                                                                                           
Verified Supplier
7 Years
Since 2019
Menu

Water Cooling Tower Components Drift Eliminator Of Cooling Tower

Price Negotiable
Price: Negotiated
MOQ: 1 Set
Delivery Time: 7 Days
Brand: Xcell Energy
Product Description

Cooling Tower Components drift eliminators save loss of water

Description:

 

* The main function of the cooling tower water collector is to recover and recycle the water in the hot steam formed by the water sprayed on the surface of the copper pipe or the packing; A device that prevents water mist pollution and freezing to the surrounding environment, saves water and protects the environment.

 

Cooling tower water appliances have accept water with high efficiency, small flow resistance, high strength, deformation, easy installation and maintenance, long service life, good flame retardant, etc. Cooling tower water receiver is also called water removal is deducted from the cooling tower hot and humid air in the midst of a large number of small droplets from drift, m type water receiver, avoid the pollution of water mist on the surrounding environment and ice, water saving and environmental protection of the device. Inclined by the cooling tower water receiver existence, namely when airflow and closed water surface vertical, prone to penetrate, s type water receiver, so the effect is not too ideal. Water receiver research aims to improve the efficiency of collecting water reduce ventilation resistance at the same time. In the mechanical ventilation cooling tower, water cooling air flow rate is needed to by installed on the top of the tower fan supply.

 

* Product features: The cooling tower water collector has the advantages of high water collection efficiency, small airflow resistance, high strength, no deformation, convenient installation and maintenance, long service life, and good flame retardancy.

At present, PVC water collectors have been widely used in various domestic office cooling towers, thermal power plants, steel plants, petrochemical plants and other industrial sectors for mechanical ventilation and natural ventilation cooling towers. Practice has proved that the design of the water collector is advanced and effective. significant


Specifications:
 
Tech Date  
Sheet Width(mm) 160-165mm
Sheet Length 1000mm/2000mm/customized
Thickness 0.6-1.5mm/customized
Sheet Spacing 42-45mm
Color blue/black
PVC Eliminator In Cooling Tower Components Evaporative Condenser Drift Eliminators 1
 
PVC Eliminator In Cooling Tower Components Evaporative Condenser Drift Eliminators 2
 
PVC Eliminator In Cooling Tower Components Evaporative Condenser Drift Eliminators 3
 
PVC Eliminator In Cooling Tower Components Evaporative Condenser Drift Eliminators 4

Related Blade Drift Eliminator

Cellular PVC Drift Eliminator For Cooling Tower 25mm 140-145mm 2

Advantages:
 

1. Water removal efficiency and low ventilation resistance

2. With sufficient assembly rigidity, its geometric shape should remain stable under normal operating conditions to ensure that the cooling tower water collector maintains a stable resistance operation effect.

3. It has the performance of non-deformation.

4. The cooling tower water collector assembly block has sufficient rigidity and strength.

5. Simple structure, easy to process and durable.

6. It has the advantages of water collection efficiency, small airflow resistance, strength, no deformation, convenient installation and maintenance, long service life, and good flame retardancy.
 

PACKING AND DELIVERY

 

S Wave High Efficiency Drift Eliminators M Wave Cooling Tower Spares 6
S Wave High Efficiency Drift Eliminators M Wave Cooling Tower Spares 7

 

 
FAQ: 

Q: Are you trading company or manufacturer ?
A: We are manufacturer with our own factory.


Q: How long is your delivery time?
A: Generally it is 5-10 days if the goods are in stock. Or it is 15-20 days if the goods are not in stock, it is according to quantity.


Q: Do you provide samples ? is it free or extra ?
A: Yes, we could offer the sample for free charge. And the freight cost will on the buyer's side.


Q: What is your terms of payment ?
A: Payment<=USD1000, 100% in advance. Payment>=USD1000, 30% T/T in advance ,balance before shipment.

 

 

 

 

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company Xcell Energy Equipment (Suzhou) Co., Ltd.
Location Room 306, Building A06, No. 66 Wanyuan Road, Dianshanhu Town, Kunshan City, Suzhou, China
Contact Person Chen

Request A Quote

Please check your email address.
Your message must be at least 20 characters.